CHIDAMBARAM MUNICIPALITY சிதம்பரம் நகராட்சி Scheme Monitoring Status Report |
| S.No | Name of Work | AS Details | TS Details | Work Order Date | Agreement Date | Agreement Period | Agreement Value | Physical Progress in % | Stage of the Work | Payment Made so far |
Financial Progress in % | Target Date As Per Agreement | ||||
| AS Number | AS Date | AS Amount | TS Number | TS Date | TS Amount | |||||||||||
| Region Status | ||||||||||||||||
| Name of the Region : CHENGALPATTU | ||||||||||||||||
| Name of the Scheme : 15th CFC | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 1 | Extension of Water Supply Distribution Main at Uncovered area and Supply and Fixing of Various size of valves in Distribution Main in Chidambaram Municipality | 21191/2021/AMRUT2 | 13/Nov/2021 | 59.5 | 2122 – 1 | 24/Dec/2021 | 59.5 | 12/Jan/2022 | 12/Jan/2022 | 270 days | 21.4 | 100 | completed | 16.44 | 0.00 | 30/Apr/2022 |
| 2 | Supply, Delivery and fixing of Incinerator at MCCs and Toilets 10 Nos | 21191/2021/AMRUT2 | 13/Nov/2021 | 59.5 | 2122 – 1 | 24/Dec/2021 | 59.5 | 21/Jan/2022 | 21/Jan/2022 | 270 days | 3 | 100 | completed | 3 | 0.00 | 20/Feb/2022 |
| 3 | Suppl and delivery and fixing of 3 HP motor , 1 ton siever machine 3 nos. | 21191/2021/AMRUT2 | 13/Nov/2021 | 59.5 | 2122 – 1 | 24/Dec/2021 | 59.5 | 21/Jan/2022 | 21/Jan/2022 | 270 days | 3 | 100 | completed | 3 | 0.00 | |
| 4 | Supply ,delivery and fixing of 5.0HP , 1 ton/hr organic shredder machine with 6.0 X1.00 conveyor belt | 21191/2021/AMRUT2 | 13/Nov/2021 | 59.5 | 2122 – 1 | 24/Dec/2021 | 59.5 | 24/Jan/2022 | 24/Jan/2022 | 270 days | 8.6 | 100 | completed | 8.6 | 0.00 | 31/Mar/2022 |
| 5 | Providing New Deep Borewell at Kanagasabai Nagar 1 No. | 21191/2021/AMRUT2 | 13/Nov/2021 | 59.5 | 2122 – 1 | 24/Dec/2021 | 59.5 | 12/Jan/2022 | 12/Jan/2022 | 270 days | 17.5 | 100 | completed | 18.29 | 0.00 | 31/Mar/2022 |
| 6 | Providing Rain Water Harvesting Reacharge pits at Various location in Chidambaram Municipality | 21191/2021/AMRUT2 | 13/Nov/2021 | 59.5 | 2122 – 1 | 24/Dec/2021 | 59.5 | 12/Jan/2022 | 12/Jan/2022 | 270 days | 2.6 | 100 | completed | 1.55 | 0.00 | 11/Feb/2022 |
| 7 | Construction of drain with culvert at sekkadi lane | T.31112/2021/CFC-1 | 20/Sep/2022 | 1.6 | 40/2022-23/ME | 20/Sep/2022 | 1.6 | 14/Nov/2022 | 14/Nov/2022 | 270 days | 1.6 | 100 | completed | 1.58 | 0.00 | 29/Dec/2022 |
| 8 | Construction of SWD at Kanagasabai nagar 2nd main road | 31112/2021/CFC-1 | 24/Aug/2022 | 4.14 | 29/2022-23/ME | 31/Aug/2022 | 4.14 | 06/Oct/2022 | 06/Oct/2022 | 270 days | 4.14 | 100 | completed | 4.1 | 0.00 | 20/Nov/2022 |
| 9 | Providing Energy Efficient LED Street light at Extension Area in Various places | 31112/2021/CFC | 14/Oct/2022 | 33.28 | 48/2022-23/ME | 07/Nov/2022 | 33.28 | 27/Jan/2023 | 06/Feb/2023 | 270 days | 33.28 | 100 | COMPLETED | 22.23 | 0.00 | 06/Aug/2023 |
| 10 | Supply and Fixing of 120 W LED Lamp fittings and Electrical accessories on Ornamental pole at Four Car Street in Chidambaram Municipality | 31112/ 2021 / CFC-1 | 03/Dec/2022 | 60.45 | 2022-23/RE | 07/Nov/2022 | 60.45 | 09/Feb/2023 | 09/Feb/2023 | 6 Months | 60.45 | 100 | EB service connection work is in progress | 38.09 | 0.00 | 09/Aug/2023 |
| 11 | Supply and Delivery of 54.5litre wheeled skid steer loader | 31112/2021/AMRUT-2 | 05/Jan/2023 | 25 | 75/2021-22-ME | 24/Dec/2021 | 25 | 20/Jun/2022 | 20/Jul/2022 | 270 days | 25 | 100 | completed | 23.44 | 0.00 | |
| 12 | Providing Paver Block Surface to Public Health Vehicle Parking area at Vageesa Nagar MCC & Rajalakshmi Nagar MCC in Chidambaram Municipality. | 31112/2021/AMRUT- 2 | 05/Jan/2021 | 7.5 | 69/2021-22-ME | 24/Dec/2021 | 7.5 | 24/Mar/2022 | 24/Mar/2022 | 270 days | 7.5 | 100 | completed | 4.43 | 59.05 | 24/Apr/2022 |
| 13 | Providing Paver Block Road at Katha Lane ward no 13 and leftout portion of appavu lane ward no 28 in Chidambaram Municipality | 31112/ 2021/AMRUT-2 | 05/Jan/2021 | 15 | 57/2021-22-ME | 24/Dec/2021 | 15 | 10/Jan/2022 | 10/Jan/2022 | 270 days | 15 | 100 | completed | 0 | 0.00 | 09/Feb/2022 |
| 14 | Relaying of Road-092/2021/001/S/000057-Bharathi Cross street (Back to Bharathi st Pillaiyar Koil) ( S to N ) , | 31112 / 2021 /AMRUT -2 | 05/Jan/2021 | 2 | 58/2021-22-ME | 24/Dec/2021 | 2 | 10/Jan/2022 | 10/Jan/2022 | 270 days | 2 | 100 | completed | 1.57 | 0.00 | 10/Feb/2022 |
| 15 | Construction of strom water drain at Katha lane in ward no 13 and south Vaniya street in ward no 31 in chidambaram muncipality | 3111 2/2021/ AMRUT-2 | 05/Jan/2021 | 6 | 62/2021-22-ME | 24/Dec/2021 | 6 | 10/Jan/2022 | 10/Jan/2022 | 270 days | 6 | 100 | completed | 0 | 0.00 | 10/Feb/2022 |
| 16 | Supply and Delivery of 8 Nos Battery Operated Vehicle to Chidambaram Municipality | 16117/2022/CFC-1 | 21/Mar/2023 | 16 | 62/2022-23-ME | 23/Mar/2023 | 16 | 21/Apr/2023 | 03/May/2023 | 270 days | 16 | 100 | completed | 15.23 | 0.00 | 02/Jun/2023 |
| 17 | Supply and Delivery of 3 Nos Light Commercial Vehicle in Chidambaram Municipality | 16117/2022/CFC- 1 | 21/Mar/2023 | 21.9 | 63/2022-23-ME | 23/Mar/2023 | 21.9 | 21/Apr/2023 | 21/Apr/2023 | 270 days | 21.9 | 100 | completed | 21.9 | 0.00 | 21/May/2023 |
| 18 | Providing and laying of additional water supply distribution pipe line in various places and house service connection(3150nos) | 29103/2025/EA-2 | 27/Sep/2025 | 360 | /2025-26/CE | 27/Sep/2025 | 360 | 27/Sep/2025 | 27/Sep/2025 | 90 Days | 360 | 40 | Out of 5717 HSC connections 2150 completed balance HSC work is in progress | 100 | 0.00 | 26/Dec/2025 |
| Name of the Scheme : 15th CFC Tied Grant | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 19 | Supply and delivery of Backhoe loader of BS-4 Engine (74 HP) with Bucket size of 0.26cum and front shovel of 1.1cum with all other necessary attachments | 16117 /2022 / CFC-1 | 03/Aug/2023 | 36.75 | 22/2023-24-ME | 04/Aug/2023 | 36.75 | 01/Sep/2023 | 07/Sep/2023 | 270 days | 36.75 | 100 | completed | 36.7 | 0.00 | 07/Oct/2023 |
| 20 | Repair and Maintenance works for Mana Lane (Compound Wall and Motor Room) OHT Tank in Chidambaram Municipality | 16117/2022/EA2 | 26/Feb/2025 | 20 | 83/2024-25/ME | 27/Feb/2025 | 20 | 15/Apr/2025 | 15/Apr/2025 | 4 Months | 20 | 100 | completed | 3.53 | 0.00 | 15/Aug/2025 |
| 21 | Repair and Maintenance works of West Car Street OHT Tank in Chidambaram Municipality. | 16117 /2022/EA-2 | 26/Feb/2025 | 9.38 | 84/2024-25/ME | 27/Feb/2025 | 9.38 | 15/Apr/2025 | 15/Apr/2025 | 3 Months | 9.38 | 100 | Completed | 0 | 0.00 | 15/Jul/2025 |
| 22 | Providing Mini Power Pump at 5 Places in Chidambaram Municipality. | 16117 /2022/ EA-2 | 26/Feb/2025 | 11.5 | 85/2024-25/ME | 27/Feb/2025 | 11.5 | 28/Mar/2025 | 28/Mar/2025 | 2 Months | 11.5 | 100 | completed | 11.5 | 94.00 | 28/May/2025 |
| 23 | Providing Paver Block Platform at Thillai Kaliyamman Zone approach Road in Chidambaram Municipality | 16117/2022/EA -2 | 26/Feb/2025 | 5 | 86/2024-25/ME | 27/Feb/2025 | 5 | 20/Mar/2025 | 20/Mar/2025 | 30 Days | 5 | 100 | completed | 5 | 0.00 | 19/Apr/2025 |
| 24 | Repair and Maintenance works of MCC Campus at Rajalashmi Nagar in Chidambaram Municipality. | 16117 / 2022/ EA-2 | 26/Feb/2025 | 8 | 87/2024-25/ME | 27/Feb/2025 | 8 | 20/Mar/2025 | 20/Mar/2025 | 2 Months | 8 | 100 | completed | 8 | 100.00 | 20/May/2025 |
| 25 | Repair and maintenance work MCC campus at Vageesa Nagar in Chidambaram Municipality | Roc No. 16117/2022/EA -2 Dated: 26/02/ 25 | 26/Feb/2025 | 6.5 | 85A/2024-25-ME | 27/Feb/2025 | 6.5 | 15/Apr/2025 | 15/Apr/2025 | 3 Months | 6.5 | 100 | completed | 6.5 | 100.00 | 15/Jul/2025 |
| 26 | Repair and maintenance of MCC campus No.1 at Municipal office back side | Roc No. 16117/ 2022/EA -2 Dated: 26/02/25 | 26/Feb/2025 | 4.5 | 86A/2024-25-ME | 27/Feb/2025 | 4.5 | 15/Apr/2025 | 15/Apr/2025 | 3 Months | 4.5 | 100 | completed | 4.5 | 100.00 | 15/Jul/2025 |
| 27 | Repair and maintenance of MCC campus No2 at Municipal office back side | RocNo. 16117/ 2022/EA-2 | 26/Feb/2025 | 3.5 | 87A/2024-25-ME | 27/Feb/2025 | 3.5 | 15/Apr/2025 | 15/Apr/2025 | 90 Days | 3.5 | 100 | completed | 3.5 | 100.00 | 14/Jul/2025 |
| 28 | COSTRUCTION OF STORM WATER DRAIN & R.C.C CULVERT WITH COVER SLAB AT CHIDAMBARAM MUNICIPALITY | 213/2025/ A1 | 13/Jun/2025 | 53 | 2025-26/RE | 18/Jun/2025 | 53 | 08/Aug/2025 | 08/Aug/2025 | 3 Months | 53 | 100 | Physically completed | 53 | 100.00 | 08/Nov/2025 |
| Name of the Scheme : 15th CFC UnTied Grant | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 29 | Relaying of Road-Bituminous Road092004R054-Nataraja Garden Main Road( E to W ) , 092016R175-ELLAMAIYAKINAR KOIL WEST STREET (N TO S) , 092017R192-Ellamainayanar koil South street (E To W) , | 11919/2022/EA2 | 30/Jan/2024 | 27 | 100/2023-24/ME | 31/Jan/2024 | 27 | 28/Feb/2024 | 28/Feb/2024 | 270 days | 27 | 100 | completed | 27 | 0.00 | 28/May/2024 |
| 30 | Relaying of Road-Bituminous Road092032R323-Ganaprakasam East Bank road ( up to Nirmila school) (S to N) , 092021R216-Gandhi Nagar 1st Cross street ( West) (E To W) , 092021R217-Gandhi Nagar 2nd Cross street ( East) (E To W) , | 207/2023/E1 | 30/Jan/2024 | 25 | 101/2023-24/ME | 31/Jan/2024 | 25 | 28/Feb/2024 | 28/Feb/2024 | 270 days | 25 | 100 | completed | 25 | 0.00 | 28/May/2024 |
| 31 | Relaying of Road-Cement Concrete Road092006R094-Vageesa Nagar 2nd Main road (Gandhi Mandabam) ( E to W ) , | 207/2023/ E1 | 30/Jan/2024 | 14.5 | 102/2023-24/ME | 31/Jan/2024 | 14.5 | 28/Feb/2024 | 28/Feb/2024 | 3 Months | 14.5 | 100 | completed | 14 | 96.58 | 28/May/2024 |
| 32 | Relaying of Road-Paver Block Road092001L01-Bharathi Cross street Tharka (E to W) , | 207 /2023 /E1 | 30/Jan/2024 | 5.5 | 103/2023-24/ME | 31/Jan/2024 | 5.5 | 28/Feb/2024 | 28/Feb/2024 | 270 days | 5.5 | 100 | completed | 3.86 | 71.26 | 28/May/2024 |
| 33 | Construction of SWD and Cover Slab at Min Nagar (Near Ration Shop) in Chidambaram Municipality | 16117 /2022 /EA-2 | 26/Feb/2025 | 15.68 | 88/204-25/ME | 27/Feb/2025 | 15.68 | 20/Mar/2025 | 20/Mar/2025 | 60 Days | 15.68 | 100 | completed | 15.68 | 0.00 | 19/May/2025 |
| 34 | Relaying of Road-Cement Concrete Road092005R080-Vadaku Vaduga Street ( W to E ) , 092005S007-Vadaku Vaduga Street Lane (S to N ) , 092007R118-Mana Mettu street ( S to N ) , 092007R129-Karai kattu chokalingam street (From North Main road) ( W to E ) , 092022R226-Kumaran street (W To E) , 092031R295-South Vaniya cross lane (S to W) , | 213/2025/A1 | 15/May/2025 | 36 | 9/2025-26-ME | 02/Jun/2025 | 36 | 26/Jun/2025 | 26/Jun/2025 | 4 Months | 36 | 100 | completed | 36 | 0.00 | 26/Oct/2025 |
| Name of the Scheme : 15thCFC-Health | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 35 | UPHC Chidambaram – Building- 1 No. | 32454/2021/AMRUT-2/Chidambaram | 17/Dec/2021 | 25 | 63/2021-2022 | 24/Dec/2021 | 25 | 21/Jan/2022 | 21/Jan/2022 | 270 days | 23.95 | 100 | Work Completed | 23.32 | 0.00 | |
| 36 | Construction of New Urban Primary Health centre at Chidambaram Municipality | 22441/23/CFC-1 | 10/Aug/2023 | 60 | 307/2023-24/RE | 30/Nov/2023 | 60 | 02/Jan/2024 | 02/Jan/2024 | 6 Months | 60 | 90 | Finishing work is in progress | 49 | 0.00 | 02/Jul/2024 |
| 37 | Construction of Additional Buildings for GH Chidambaram | 19731/2023/EA-2 | 19/Jan/2024 | 500 | CE/2023-24 | 20/Jan/2024 | 500 | 29/Feb/2024 | 29/Feb/2024 | 12 Months | 500 | 100 | Physically completed | 481.17 | 0.00 | 28/Feb/2025 |
| Name of the Scheme : AMRUT 2.O | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 38 | New Combined Water Supply Scheme to Chidambaram Municipality | G.O.(Ms)No.7 | 20/Jan/2023 | 14319 | 49/2022-23/CE TWAD | 14/Dec/2022 | 14319 | 28/Aug/2023 | 28/Aug/2023 | 18 Months | 12768 | 100 | completed | 8315 | 0.00 | 28/Feb/2025 |
| Name of the Scheme : CGF | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 39 | Providing Disposal arrangements for Treated effluent in the River Vellar from STP | Roc No.29404/2022/SS2 | 30/Mar/2023 | 485 | 102 /22-23/CE | 20/Apr/2023 | 478 | 15/Dec/2023 | 15/Dec/2023 | 9 Months | 478 | 100 | completed | 408.66 | 0.00 | 15/Sep/2024 |
| 40 | REJUVENATION WORK AT IN C.VAKARAMARI, TS.NO: 15 AND 25 IN CHIDAMBARAM. | 21062/2023/SS2 | 07/Aug/2023 | 203 | /2023-24/CE | 28/Aug/2023 | 203 | 10/Oct/2023 | 10/Oct/2023 | 540 Days | 203 | 100 | completed | 203 | 100.00 | 02/Apr/2025 |
| Name of the Scheme : CMBFS-COMMON KITCHEN | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 41 | Construction of common kitchen at Chidambaram Municipality | 17404/2022/M1 | 10/Mar/2023 | 28 | 61/2022-23/ME | 10/Mar/2023 | 28 | 12/Apr/2023 | 12/Apr/2023 | 90 Days | 28 | 100 | completed | 28 | 100.00 | 11/Jul/2023 |
| Name of the Scheme : Dormant Account and Interest Fund | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 42 | Relaying of Road-092001R018-Kannusamy Nagar (SPF No.14/CDM/2018) (E to W) , 092001R019-Kannusamy Nagar (SPF No.14/CDM/2018) (N to S) , 092001R020-Kannusamy Nagar (SPF No.14/CDM/2018) (E to W) , 092004R070-GN Nagar (SPF No. /CDM/2018(E TO W) , 092004R071-Nataraja Garden Scheme salai (SPF No.19/CDM/2018) , 092004R076-Nataraja Garden – 3 , 092032R319-Sivasiva Nagar 1st cross street (N to S) , 092032R327-Aranganathan Nagar (E to W) extn. , 092013R163-Annai Nagar (SPF No. 11/CDM/2018 (N to S) , | 20499/2023/SS3 | 21/Jun/2023 | 65 | /2023-24/RE | 26/Jun/2023 | 65 | 27/Jul/2023 | 270 Days | 65 | 100 | 63.75 | 0.00 | |||
| Name of the Scheme : General Fund | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 43 | Maintenance works of Municipal shops at Chinna street in chidambaram municipality | MCR No. 310 | 30/Apr/2025 | 9 | 55/2025-26-ME | 22/Dec/2025 | 9 | 23/Feb/2026 | 23/Feb/2026 | 3 Months | 9 | 100 | work physically completed | 0 | 0.00 | 23/May/2026 |
| Name of the Scheme : Grants for Tourism Towns – Fixed Grant | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 44 | Construction of Strom Water Drain at Kallukadai Street(W to E)(092004R055),MGR Nagar Main Road(E to W)(092004R056) and Thillai Kaliyamman Koil Street(S to N)(092006R080) in Chidambaram Municipality | CMA Roc No. 12709/2024/SS2 | 27/Nov/2025 | 87.2 | 136/2025-26/RE | 02/Dec/2025 | 87.2 | 29/Dec/2025 | 29/Dec/2025 | 3 Months | 87.2 | 100 | Completed | 71.11 | 81.54 | 29/Mar/2026 |
| 45 | CONSTRUCTION OF STROM WATER DRAIN AT NORTH MAIN ROAD (N TO S) IN CHIDAMBARAM MUNICIPALITY | DMA /12709/2024/SS2 | 08/Feb/2026 | 15 | 72/2025-26 – 1 | 09/Feb/2026 | 15 | 06/Mar/2026 | 06/Mar/2026 | 1 Months | 15 | 100 | work completed | 15 | 100.00 | 06/Apr/2026 |
| Name of the Scheme : I & A | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 46 | Construction of New Bus Stand | G.O.(Ms)No.28 | 22/Feb/2023 | 1500 | /2022-23-CE | 21/Apr/2023 | 150 | 02/Jun/2023 | 02/Jun/2023 | 18 Months | 150 | 80 | Busbay 4 Tensile roof work completed and busbay 2 & 3 brickwork completed, busbay 1 tensile roof work, arch building tiles laying work and busbay 2 & 3 plastering and electrification work is in progress | 943.44 | 0.00 | 02/Dec/2024 |
| Name of the Scheme : Kalaignar Nagarpura Mempatu Thittam | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 47 | New Creation of Park at Nataraja Garden Layout ward No :4 , TS No: 69/1P,2P, 28/2P, 28/4, 29/2P, 25/2,3,4,25/13P, block -1, Ward No – 2 | G.O. (Ms) No.92 MAWS (NS) Dept. | 30/Oct/2021 | 58 | 290/2021-2022 | 22/Nov/2021 | 58 | 24/Jan/2022 | 24/Jan/2022 | 270 days | 52.94 | 100 | completed | 48.92 | 0.00 | 23/Apr/2022 |
| 48 | Construction of Modern Gasifier Crematorium at Municipal Burial Ground (Near pulichamedu TS :No: 91/1C) In Chidambaram Municipality | G.O.(Ms) No. 92 MAWS (NS) Dept. | 30/Oct/2021 | 150 | 359/2021-2022 | 22/Nov/2021 | 150 | 24/Jan/2022 | 24/Jan/2022 | 270 Days | 122.72 | 100 | COMPLETED | 145.57 | 97.35 | 21/Oct/2022 |
| 49 | Providing Paver Block Road at Dobikanna Road Ward No 1 092001R003 Thilainathan Nagar Ward No 1 092001R021 Aasirwatham Nagar Ward No 4 092004R051 Amma Nagar Ward No 4 092004R077 Nataraja Garden Internal cross road Ward No 4 092004R078 Muthukrishnan NagarWard No 22 092022R229 |
G.O.(Ms) No.92 MAWS (NS) Dept. | 30/Oct/2021 | 132 | 113/2021-2022 – 1 | 19/Nov/2021 | 132 | 21/Dec/2021 | 21/Dec/2021 | 270 Months | 133.95 | 100 | completed | 125.93 | 95.40 | 21/Jun/2044 |
| 50 | Construction of Daily Market at north main road (Ward No. 4), Block No. 3, TS.No. 76/1A, 2A) | G.O.(Ms) No.19 MAWS (NS), Dept. | 25/Jan/2022 | 577 | 686/2021-22 | 01/Mar/2022 | 577 | 27/May/2022 | 27/May/2022 | 540 Days | 566.09 | 100 | work completed | 515.65 | 89.37 | 18/Nov/2023 |
| 51 | Rejuvenation of Water Bodies – Periyanna kulam in Ward.No.3., Block 26, T.S.No.18 in Chidambaram Municipality | G.O.(Ms) No.73 MAWS (NS) Dept. | 13/May/2022 | 149.7 | 158/2022-23 | 25/May/2022 | 139 | 06/Jul/2022 | 06/Jul/2022 | 270 Days | 133.03 | 100 | completed | 132.7 | 88.64 | 02/Apr/2023 |
| 52 | Rejuvenation of Water Bodies – Gnanaprakasam Kulam Ward No 4 , Block No :14, TS.No: 1037 in Chidambaram Municipality | G.O.(Ms) No. 73 MAWS (NS) Dept. | 13/May/2022 | 315 | 159/2022-23 | 25/May/2022 | 280 | 06/Jul/2022 | 29/Jul/2022 | 120 Days | 269.39 | 100 | Completed | 280 | 0.00 | 26/Nov/2022 |
| 53 | Construction of knowledge centre at Bharathidasan Street, ward no.4, block no. 13 TS No. 1018/1 (Type-2) | G.O.(Ms) No.88 MAWS (NS) Dept. | 17/Jun/2022 | 199 | 001/2022/D01 | 28/Jun/2022 | 199 | 26/Feb/2024 | 26/Feb/2024 | 270 Days | 193.61 | 100 | completed | 181.17 | 91.04 | 22/Nov/2024 |
| 54 | Kumaran Kulam Ward No. 4, Block No. 22, TS No. 1514 | G.O. (Ms) No.88 MAWS (NS) Dept. | 17/Jun/2022 | 81.4 | 001/2022/D01 | 28/Jun/2022 | 81.4 | 29/Aug/2022 | 29/Aug/2022 | 60 Days | 83.78 | 100 | completed | 81.4 | 0.00 | 28/Oct/2022 |
| 55 | Park at Manmathasamy Nagar ward no. 3 block no. 31, TS No. 1377 | G.O.(Ms) No. 88 MAWS (NS) Dept. | 17/Jun/2022 | 18 | 001/2022/DO1 | 28/Jun/2022 | 18 | 04/Aug/2022 | 11/Aug/2022 | 270 Days | 16.29 | 100 | completed | 17.39 | 0.00 | 08/May/2023 |
| 56 | Water Bodies at Palaman Kulam Ward No. 4 Block 17 TS No. 1127 in Chidambaram Municipality | G.O.(4D) No. 18 MAWS (SS&FC) Dept. | 21/Oct/2022 | 31 | 2022-23 | 02/Nov/2022 | 31 | 01/Dec/2022 | 01/Dec/2022 | 60 Days | 31 | 100 | completed | 31 | 0.00 | 30/Jan/2023 |
| 57 | Water Bodies at Karaikuttai Kulam Ward No. 5 Block 12 TS No. 931 in Chidambaram Municipality | G.O. (4D) No.18 MAWS (SS&FC) Dept. | 21/Oct/2022 | 20 | 2022-23-1 | 02/Nov/2022 | 20 | 01/Dec/2022 | 01/Dec/2022 | 60 Days | 20 | 100 | completed | 20 | 0.00 | 30/Jan/2023 |
| 58 | Water Bodies at Ayee Kulam Ward No. 5 Block 11 TS No. 860 in Chidambaram Municipality | G.O.(4D)No.18 MAWS(SSFC) Dept., – I – Chidambaram 3 | 21/Oct/2022 | 66 | 105/2022-23-RE | 03/Nov/2022 | 66 | 01/Dec/2022 | 01/Dec/2022 | 6 Months | 65.34 | 100 | completed | 66.95 | 100.00 | 01/Jun/2023 |
| 59 | Park at Vageesa Nagar Park Ward No. C Block 30, SF No. 1308 in Chidambaram Municipality | G.O.(4D) No.18 MAWS (SS&FC) Dept. | 21/Oct/2022 | 20 | 2022-23-2 | 02/Nov/2022 | 20 | 01/Dec/2022 | 01/Dec/2022 | 60 Days | 20 | 100 | completed | 17.87 | 0.00 | 30/Jan/2023 |
| 60 | Park at Ponnabalam Nagar Ward No. E Block 12, SF No. 937/26 in Chidambaram Municipality | G.O.(4D) No.18 MAWS (SS&FC)Dept. | 21/Oct/2022 | 26 | 2022-23-3 | 02/Nov/2022 | 26 | 01/Dec/2022 | 01/Dec/2022 | 60 Days | 26 | 100 | completed | 26 | 100.00 | 30/Jan/2023 |
| 61 | Rejuvenation of Water Body at Thatchan Kulam in Ward 5, Block No. 13, T.S. No. 951 | G.O (4D) No.39 | 14/Sep/2023 | 95 | 298/2023-24/CE | 29/Sep/2023 | 95 | 27/Nov/2023 | 27/Nov/2023 | 270 Days | 95 | 100 | completed | 85.54 | 0.00 | 23/Aug/2024 |
| 62 | Park at Susilambal Nagar, Ward No.31, Survey No. 1013/14 | G.O. (4D) No. 39 | 14/Sep/2023 | 19 | 25/2023-24/ME | 29/Sep/2023 | 19 | 27/Nov/2023 | 27/Nov/2023 | 3 Months | 19 | 100 | completed | 17.1 | 0.00 | 27/Feb/2024 |
| 63 | Development park at GN Nagar in chidambaram Municipality | MAWS DPT GO(4D) No.44 | 03/Nov/2023 | 27 | 70/2023-24/ME | 03/Nov/2023 | 27 | 15/Dec/2023 | 18/Dec/2023 | 60 Days | 27 | 100 | completed | 23.14 | 85.71 | 16/Feb/2024 |
| 64 | Improvement and beautification of Water Body in Nagachery lake for Chidambaram Municipality | 12th CPSMC minutes of meeting -1 | 12/Jul/2024 | 151 | /2024-25/CE | 24/Jul/2024 | 151 | 04/Sep/2024 | 04/Sep/2024 | 6 Months | 151 | 100 | Physically Completed | 109.75 | 0.00 | 04/Mar/2025 |
| 65 | Improvement and beautification of Water body in omakulam lake for Chidambaram Municipality | 12th CPSMC minutes of meeting -4 | 12/Jul/2024 | 117 | /2024-25/CE | 24/Jul/2024 | 117 | 04/Sep/2024 | 04/Sep/2024 | 6 Months | 117 | 96 | Nearing completion | 59.75 | 0.00 | 04/Mar/2025 |
| 66 | Construction of Compoundwall and drainage system in daily market in North main road in Chidambaram Municipality | 12th CPSMC minutes of meeting -2 | 12/Jul/2024 | 70 | /2024-25/RE | 30/Jul/2024 | 70 | 04/Sep/2024 | 04/Sep/2024 | 4 Days | 70 | 100 | completed | 60.2 | 0.00 | 08/Sep/2024 |
| 67 | Green space development at rajalakhsmi nagar ward no. 2 Survey no. 22/1384 in chidambaram municipality | 12th CPSMC minutes of meeting -3 | 12/Jul/2024 | 25 | 15/2024-25/ME | 30/Jul/2024 | 25 | 04/Sep/2024 | 04/Sep/2024 | 3 Months | 25 | 100 | completed | 25 | 0.00 | 04/Dec/2024 |
| 68 | Proposed Construction of shopping complex at Chidambaram Municipality | 12th CPSMC minutes of meeting -5 | 12/Jul/2024 | 303 | /2024-25/CE | 24/Jul/2024 | 303 | 04/Sep/2024 | 04/Sep/2024 | 540 Days | 303 | 0 | Work Cancelled | 0 | 0.00 | 26/Feb/2026 |
| 69 | Construction of New Bus-shelter in Chidambaram Old Bus-stand complex in Chidambaram Municipality | 13th CPSMC minutes of meeting date 09.09.2024 | 09/Sep/2024 | 447 | /2024-25/CE | 12/Sep/2024 | 447 | 12/Nov/2024 | 12/Nov/2024 | 9 Months | 447 | 100 | Completed | 406.95 | 0.00 | 12/Aug/2025 |
| 70 | Green space at Nataraja garden in Chidambaram municipality | 19th CPSMC minutes of meeting date 09.04.2025 | 09/Apr/2025 | 30 | 8/2025-26/ME | 10/Apr/2025 | 30 | 16/May/2025 | 16/May/2025 | 3 Months | 30 | 100 | completed | 27 | 90.00 | 16/Aug/2025 |
| 71 | Relaying of Road-Earthern to BT Road092001R012-Amsam Nagar (SPF No. 6/CDM/2018 )( N to S ) , 092002R031-Rajalakshmi Nagar 4th Cross ( MCC Back side road) , 092002R033-Rajalakshmi Nagar 2nd Cross street (W to E ) , 092004R068-Saranarayana Nagar (SPF No. 2/CDM/2018 , 092031R307-Kanagasabai Nagar 12th Cross street , 092032R328-Aranganathan Nagar (N to S) extn. , | 18th CPSMC minutes of meeting date 02.04.2025 | 02/Apr/2025 | 37 | 5/2025-26/ME | 04/Apr/2025 | 37 | 09/May/2025 | 09/May/2025 | 120 Days | 37 | 100 | completed | 33.3 | 0.00 | 06/Sep/2025 |
| 72 | Construction of Storm Water Drain and Culvert at Eda Street (Thoppaiyan Street to Omakulam Road)(N to S)092027R255, Eda Street (Kasu Kadai to Thoppaiyan Street )(S To N)092026R232, Sunambukara street(N to S)092025R225, Kothangudi Main road School and Busstand road(N To S)092021R210, Jawagar street Main road. ( E to W )092010R132 in Chidambaram Municipality | 21th CPSMC minutes of meeting | 30/Apr/2025 | 137 | /2025-26/CE | 08/May/2025 | 137 | 20/Jun/2025 | 20/Jun/2025 | 120 Days | 137 | 100 | work completed | 124.78 | 0.00 | 18/Oct/2025 |
| Name of the Scheme : MLA Fund | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 73 | Providing mini power pump at Ward no.7 in chidambaram Municipality | 5541/2021/A2 | 09/Sep/2022 | 2.25 | 37/2022-23/ME | 09/Sep/2022 | 2.25 | 28/Oct/2022 | 04/Nov/2022 | 270 days | 2.25 | 100 | completed | 2.24 | 0.00 | 04/Dec/2022 |
| 74 | Providing Minipower pump at Ward no.8 in Chidambaram Municipality | 5541 /2021/A2 | 09/Sep/2022 | 2.25 | 36/2022-23/ME | 09/Sep/2022 | 2.25 | 28/Oct/2022 | 04/Nov/2022 | 270 days | 2.25 | 100 | completed | 2.23 | 0.00 | 04/Dec/2022 |
| Name of the Scheme : MP Fund | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 75 | Supply and delivery and Installation of Mini High Mast Solar Lighting arrangments at Ward No: 21 in Chidambaram Municipality | DRDA Roc No. A3/2545/2025 | 16/Sep/2025 | 5 | 41/2025-26-ME | 03/Sep/2025 | 5 | 10/Oct/2025 | 10/Oct/2025 | 30 Days | 5 | 100 | Work completed | 5 | 100.00 | 09/Nov/2025 |
| 76 | Supply and delivery and Installation of Mini High Mast Solar Lighting arrangments at Ward No: 26 in Chidambaram Municipality | DRDA Roc No.A3/2545/2025 | 16/Sep/2025 | 5 | 42/2025-26-ME | 03/Sep/2025 | 5 | 10/Oct/2025 | 10/Oct/2025 | 30 Days | 5 | 100 | Work completed | 5 | 100.00 | 09/Nov/2025 |
| 77 | Construction of Kitchen and Store Room at Anganwadi building kothangudi street ward no. 21 in chidambaram municipality | DRDA Roc No.. A3/2545/2025 | 16/Sep/2025 | 10 | 43/2025-26-ME | 03/Sep/2025 | 10 | 10/Oct/2025 | 10/Oct/2025 | 30 Days | 10 | 100 | completed | 10 | 100.00 | 09/Nov/2025 |
| 78 | Construction of PD shop at Ward No. 21 in Chidambaram Municipality | DRDA roc No A3/2743/2025 | 12/Nov/2025 | 12 | 53/2025-26 | 12/Nov/2025 | 12 | 24/Dec/2025 | 24/Dec/2025 | 30 Days | 12 | 100 | completed | 12 | 100.00 | 23/Jan/2026 |
| Name of the Scheme : Nagarpura Salai Mempattu Thittam | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 79 | Relaying of Road-092/004/L/0001-KALLUKADAI LANE , 092/004/L/0006-Katharkhan Thaikkal Street , 092/2021/001/R/000062-Sagajanandha Street (E to W ) , 092/001/L/0008-Arunthanthiyar Lane (E to W ) , 092/005/S/0007-Puliyanthopphu Ist & 2nd cross lane , 092/033/S/0003-Indhira Nagar ( E to W) , 092/006/S/0005-Sathiya Nagar Main Road , 092/2021/028/R/0000165-Ponnambalam Nagar cross road 1st cross (E to W) , 092/010/L/0002-Chinna Kajar street Ist cross lane , 092/010/L/0005-Chinna Kajar street 2nd | G.O. (D) No.192 | 31/Mar/2023 | 29.5 | 64/2022-23/ME | 12/Apr/2023 | 29.5 | 28/Apr/2023 | 03/May/2023 | 270 days | 29.5 | 100 | completed | 29.5 | 0.00 | 02/Jun/2023 |
| 80 | Package – 7 Relaying of Road-Bituminous Road092022R221-Kothangudi Street ( North ) (W To E) , 092022R225-Kothangudi Main road School and Busstand road (N To S) , 092023R231-Bole Narayanan Street (S to N) , 092023R232-Satthapadi street (E to W) , 092024R236-Umayal street (S to N) , 092024R237-Kasimadam street (SP Koil st to Pilliyar koil) (S to N) , 092026R242-Sunambukara street(N to S) , 092027R252-Kottaiyan Street (E to W) , 092015R170-Kollu Mettu Street Main road (N To S) , 092015R171-Kollu M | 18th CPSMC minutes of meeting date 02.04.2025 | 02/Apr/2025 | 95 | 52/2025-26/RE | 04/Apr/2025 | 95 | 31/Jul/2025 | 31/Jul/2025 | 4 Months | 95 | 100 | completed | 85.5 | 0.00 | |
| 81 | Package – 8, Relaying of Road-Bituminous Road092029R282-Lalpettai Street ( W to E ) , 092030R286-Selva vinayagar Nagar Cross street , 092030R292-Kanagasabai Nagar 10th Cross street (W to E) , 092030R287-Bharathidhasan St (Kanagasabai Nagar to Sabanayagar st) (W to E) , 092030R285-Selva vinayagar Nagar main road , 092031R308-Kanagasabai Nagar 13th Cross street (W to E) , 092031R306-Kanagasabai Nagar 11th Cross street Tank road (W to E) , 092031R309-Kanagasabai Nagar 14th Cross street (W to E) | 18th CPSMC minutes of meeting date 02.04.2025 | 02/Apr/2025 | 66 | 53/2025-26/RE | 04/Apr/2025 | 66 | 26/Jun/2025 | 26/Jun/2025 | 120 Days | 66 | 100 | Physically completed | 58.34 | 0.00 | 24/Oct/2025 |
| 82 | Package – 9, Relaying of Road-Cement Concrete Road092006R093-Vageesa Nagar 2nd Main road (Gandhi Mandabam) ( E to W ) , 092006R096-Vageesa Nagar( MS Nagar Park cross ) ( N to S ) , 092008S015-16 PILLAR STREET 1ST CROSS , 092016R181-ELAMMAIYAKKINAR KOIL STREET LANE ( N TO S) , 092028S012-Omakulam Lane West side ( E to W ) , 092032S018-Ganaparagasam Lane (School side road) (N to S) , 092033S022-Ambedhkar Nagar (Palamman) (S to N) , 092033S023-Palamon Karai (N to S) , | 18th CPSMC minutes of meeting date 02.04.2025 | 02/Apr/2025 | 52 | 54/2025-26/RE | 04/Apr/2025 | 52 | 26/Jun/2025 | 26/Jun/2025 | 120 Days | 52 | 100 | Work completed | 22.51 | 0.00 | |
| 83 | Package – 2, Relaying of Road-Bituminous Road092001R001-Old Bhuvanagiri Road ( S to N ) , 092001R006-Siva Shanmugam street ( E to W ) , 092001R002-SINGARATHOPPU , 092001R004-BHARATHI STREET , 092002R022-Anandharayar Street ( W to E ) , 092002R023-Karaikattu Street ( From Kanniraman to Chittiyar ground)( W to E ) , 092002R025-Samanthakara street ( W to E ) , 092002R026-Thuravadi street ( S to N ) , 092002R024-Karaikattu Street ( From From Anandarayar to Sambanthakara st) ( N to S | 18th CPSMC minutes of meeting date 02.04.2025 | 02/Apr/2025 | 136 | /2025-26/CE | 08/Apr/2025 | 136 | 17/Jul/2025 | 17/Jul/2025 | 120 Days | 136 | 100 | Physically completed | 122.4 | 0.00 | 14/Nov/2025 |
| 84 | Relaying of Road-Bituminous Road092015R168-Eda Street (Kasu Kadai to Thoppaiyan Street ) (S To N) , 092028R269-Eda Street (Thoppaiyan Street to Omakulam Road) (N to S) , | 18th CPSMC Minutes of Meeting | 02/Apr/2025 | 67 | 51/2025-26/RE | 04/Apr/2025 | 67 | 20/Jun/2025 | 20/Jun/2025 | 90 Days | 67 | 100 | completed | 67 | 100.00 | 18/Sep/2025 |
| 85 | Package – 3, Relaying of Road-Bituminous Road92004R066-GN Nagar (SPF No. /CDM/2018 ( N to S) , 092004R055-Nataraja Garden Cross Road ( S to N ) , 092004R057-Kallukadai Street ( W to E ) , 092003R036-Muthumanikam cross street( Connecting Javagar street) (N to S ) , 092003R035-Muthumanikam street ( W to E ) , 092005R079-Mosque Street ( E to W ) , 092006R081-Thillai Kaliyamman Koil Street ( S to N ) , 092006R086-Vageesa Nagar 1st Main road ( W to E ) , 092006R082-Vengan main road ( S to N | 18th CPS MC minutes of meeting dated 02.04.2025 | 02/Apr/2025 | 121 | /2025-26/CE | 08/Apr/2025 | 121 | 30/Jun/2025 | 30/Jun/2025 | 120 Days | 121 | 100 | completed | 121 | 0.00 | 28/Oct/2025 |
| 86 | Package-4, Relaying of Road-Bituminous Road092007R102-M.S. Nagar Main Road ( S to N ) , 092007R104-M.S. Nagar 2nd Cross street ( W to E ) , 092007R106-M.S. Nagar Cross street ( Park road)( W to E ) , 092007R100-Mana Lane( Anjayaner koil street) ( W to E ) , 092007R101-Mana Lane( Tank road) ( W to E ) , 092007R103-M.S. Nagar 1st Cross street ( W to E ) , 092007R105-M.S. Nagar Cross street ( School entrance) ( W to E ) , 092007R107-Thillai Nagar Main road ( N to S ) , 92007R117-THERADI | 18th CP SMC minutes of meeting | 02/Apr/2025 | 123 | /2025-26/CE | 08/Apr/2025 | 123 | 30/Jun/2025 | 30/Jun/2025 | 120 Days | 123 | 100 | completed | 110.7 | 90.00 | 28/Oct/2025 |
| 87 | Package – 5, Relaying of Road-Bituminous Road92011R138-Vilangiyamman Koil Street ( N to S ) , 092011R138-Katcheri Street ( S to N ) , 092012R146-Kanniponnusamy (Kanniraman st to Anikaran street) (E To W) , 092012R144-Aanikaran Street (E To W) , 092012R145-Aanikaran cross Street( Connecting Gayatheriamman koil st) (E To W) , 092012R148-Pudhupettai pillayar Koil Street (W To E) , 092014R165-Andeswaran koil main road ( N To S ) , 092014R166-Throwpathi amman koil street ( E To W ) , 092013R1 | 18th CPSMC minutes of meeting date 02.04.2025 | 02/Apr/2025 | 127 | /2025-26/CE | 04/Apr/2025 | 127 | 23/Jul/2025 | 23/Jul/2025 | 6 Months | 127 | 100 | Completed | 94.69 | 0.00 | 23/Jan/2026 |
| 88 | Package – 6 Relaying of Road-Bituminous Road092016R178-Thagam Theertha Pillaiyar Koil Street (N To S ) , 6-Ellaiamman Koil Street ( E To W ) , 092015R180-Viswanathan Street ( S To N) , 092015R181-Nattu Street (W To E) , 092015R183-State Bank colony main road (S To N) , 092015R185-Murugan street (S To N) , 092015R184-State Bank colony cross road (W To E) , 092017R193-Ellamainayanar koil Madam street (W To E) , 092017R194-Periya kajar street (S To N) , 092017R186-Chinna Street (N To S) , 092017R | 18th C PSMC minutes of meeting date 02.04.2025 | 02/Apr/2025 | 125 | /2025-26/CE | 08/Apr/2025 | 125 | 30/Jun/2025 | 30/Jun/2025 | 120 Days | 125 | 100 | completed | 117.4 | 93.92 | 28/Oct/2025 |
| Name of the Scheme : Namakku Naame Thittam | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 89 | Construction of Library Building at Katchery Street, Wad No.11 (Opp. to Chidambaram Municipal Office) | ROC.NO 27519-36/2021/P2–I-Chidambaram | 30/Mar/2022 | 48 | /2021-22 | 04/May/2022 | 48 | 24/May/2022 | 24/May/2022 | 270 days | 39.55 | 100 | completed | 44.59 | 0.00 | 24/Sep/2022 |
| 90 | Providing Chain link fencing 130m x 1.50m and Children’s Playing equipment (Double seesaw -1no, steel swing – 1no) arrangements to Aasirwatham nagar Municipal park | ROC.NO 27519-36/2021/P2–I-Chidambaram 2 | 31/Mar/2022 | 9.3 | 27519-37/2021/P2 | 31/Mar/2022 | 9.3 | 20/May/2022 | 20/May/2022 | 270 days | 8.09 | 100 | completed | 9.04 | 0.00 | 20/Aug/2022 |
| 91 | Repair /Maintenance-092/2021/018/R/0000249-Manvetti Packkiri Lane (N To S) , | 27519-49 | 13/Aug/2022 | 12 | 2021-22 | 22/Aug/2022 | 12 | 07/Sep/2022 | 15/Sep/2022 | 270 days | 11.8 | 100 | completed | 11.88 | 0.00 | |
| 92 | Construction of Compound Wall at Kutchery Street Library building in Chidambaram Municipality | 837 /2022 / B1 | 20/Feb/2023 | 7.5 | 56/2022-23-ME | 22/Feb/2023 | 7.5 | 17/Mar/2023 | 17/Mar/2023 | 270 days | 7.5 | 100 | completed | 7.5 | 0.00 | 01/May/2023 |
| 93 | Providing Smart Class Room Arrangements at North car street Municipal Middle School in Chidambaram Municipality. | 837/2022 /B1 | 20/Feb/2023 | 12 | 57/2022-23-ME | 22/Feb/2023 | 12 | 17/Mar/2023 | 17/Mar/2023 | 3 Months | 12 | 100 | completed | 10 | 0.00 | 17/Jun/2023 |
| 94 | IMPROVEMENT OF GANDHI PARK IN CHIDAMBARAM MUNICIPALITY. | 837/2022/B1 | 20/Feb/2023 | 11 | 55/2022-23-ME | 22/Feb/2023 | 11 | 17/Mar/2023 | 17/Mar/2023 | 45 Days | 11 | 100 | completed | 11 | 99.99 | 01/May/2023 |
| 95 | Providing Smart Class room at Municipal School in Malaikatti Street | 837/2022/B1/4 | 16/Mar/2023 | 13.8 | 60/2022-23-ME | 23/Mar/2023 | 13.8 | 12/Apr/2023 | 12/Apr/2023 | 270 days | 13.8 | 100 | completed | 13.8 | 0.00 | 27/May/2023 |
| 96 | Improvement works for Ration Shop at Vellapirandhan Street Ward No. 17 in Chidambaram Municipality | 837/2022/B1_5 | 16/Mar/2023 | 1.5 | 59/2022-23-ME | 23/Mar/2023 | 1.5 | 12/Apr/2023 | 12/Apr/2023 | 270 days | 1.5 | 100 | completed | 1.37 | 0.00 | 27/May/2023 |
| 97 | Providing CCTV arrangements at 11 Locations (44 Nos) in Ward No: 17 in Chidambaram Municipality | 837/2022/B1_6 | 16/Mar/2023 | 5.8 | 58/2022-23-ME | 23/Mar/2023 | 5.8 | 12/Apr/2023 | 12/Apr/2023 | 270 days | 5.8 | 100 | completed | 5.8 | 0.00 | 12/May/2023 |
| 98 | Relaying of Road-Paver Block Road092015L004-Thennan thoppu Lane ( E to W ) , | 837/2022/B1-1 | 10/Jul/2024 | 2.5 | 6/2024-25/ME | 19/Jul/2024 | 2.5 | 09/Aug/2024 | 09/Aug/2024 | 270 days | 2.5 | 100 | completed | 2.5 | 0.00 | 08/Sep/2024 |
| 99 | Construction of Drain and Culvert at Throwpathi amman koil street in Chidambaram Municipality | 837/2022/B1-2 | 10/Jul/2024 | 3.5 | 7/2024-25/ME | 19/Jul/2024 | 3.5 | 09/Aug/2024 | 09/Aug/2024 | 270 days | 3.5 | 100 | completed | 3.25 | 0.00 | 08/Sep/2024 |
| 100 | Providing SS handrails at Ayeekulam in chidambaram Municipality | RDMA Roc No. 1609/2025/B1 | 20/Nov/2025 | 28 | 55/2025-26-ME | 20/Nov/2025 | 28 | 12/Dec/2025 | 12/Dec/2025 | 30 Days | 28 | 100 | completed | 24.92 | 89.00 | 11/Jan/2026 |
| 101 | Providing SS handrails at Karaikuttaikulam in chidambaram Municipality | RDMA Roc No.1609/2025/B1 | 20/Nov/2025 | 11 | 54/2025-26-ME | 20/Nov/2025 | 11 | 12/Dec/2025 | 12/Dec/2025 | 30 Days | 11 | 100 | Completed | 11 | 100.00 | 11/Jan/2026 |
| Name of the Scheme : O&M AND INFRA GAP FILLING FUND | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 102 | SPECIAL MAINTENANCE AT KUNJIRAMOORTHI VINAYAGAR KOIL STREET COMMUNITY TOILET WARD NO. 15 | 19089/2021/E2 | 19/Nov/2021 | 32.65 | 2122 – 1 | 19/Nov/2021 | 32.65 | 03/Jan/2022 | 03/Jan/2022 | 270 days | 4.92 | 100 | completed | 3.57 | 0.00 | 15/Apr/2022 |
| 103 | SPECIAL MAINTENANCE AT BYEPASS COMMUNITY TOILET IN WARD NO. 1 | 19089/2021/E2 | 19/Nov/2021 | 32.65 | 2122 – 1 | 19/Nov/2021 | 32.65 | 03/Jan/2022 | 03/Jan/2022 | 270 days | 8.72 | 100 | completed | 10 | 0.00 | 15/Apr/2022 |
| 104 | SPECIAL MAINTENANCE AT LALKHAN STREET PUBLIC TOILET WARD NO. 10 | 19089/2021/E2 | 19/Nov/2021 | 32.65 | 2122 – 1 | 19/Nov/2021 | 32.65 | 03/Jan/2022 | 03/Jan/2022 | 270 days | 2.98 | 100 | completed | 2.81 | 0.00 | 15/Apr/2022 |
| 105 | SPECIAL MAINTENANCE AT WEST CAR STREET PUBLIC TOILET IN WARD NO.18 | 19089/2021/E2 | 19/Nov/2021 | 32.65 | 2122 – 1 | 19/Nov/2021 | 32.65 | 03/Jan/2022 | 03/Jan/2022 | 270 days | 4.59 | 100 | completed | 3.92 | 0.00 | 15/Apr/2022 |
| Name of the Scheme : O&M DEFICIT GRANT FUND | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 106 | PROVIDING ADDITIONAL WORKS AND EARTH FILLING FOR NEW BUS STAND AT LALPURAM IN CHIDAMBARAM MUNICIPALITY. |
12079/2024/SS2 | 06/Feb/2025 | 830 | /2024-25/CE | 10/Feb/2025 | 830 | 08/Apr/2025 | 08/Apr/2025 | 6 Months | 830 | 85 | Grill fabrication work and sand filling work is in progress | 568.33 | 0.00 | 08/Oct/2025 |
| Name of the Scheme : Others | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 107 | Construction of Library Ist floor at katchery street (Municipal office opposite) ward no. 11 in chidambaram municipality | RDMA Roc No.299/2024/A1 | 20/Sep/2024 | 22 | 23/2024-25/ME | 20/Sep/2024 | 22 | 18/Oct/2024 | 18/Oct/2024 | 270 Days | 22 | 100 | completed | 22 | 100.00 | 15/Jul/2025 |
| 108 | Construction of Anganwadi Center at Kanagasabai Nagar in chidambaram municipality | District collector, cuddalore Roc No 2982/2024 | 05/Jul/2024 | 15 | 5/2024-25/ME | 08/Jul/2024 | 15 | 05/Aug/2024 | 05/Aug/2024 | 4 Months | 15 | 100 | completed | 15 | 0.00 | 05/Dec/2024 |
| 109 | Implementation of Green school at sambanthakara municipal girls high school in chidambaram municipality | The dist collr Roc No. 6500/2022/D | 29/May/2025 | 19 | 8/2025-26/ME | 29/May/2025 | 19 | 20/Jun/2025 | 20/Jun/2025 | 3 Months | 19 | 100 | completed | 15.46 | 81.37 | 20/Sep/2025 |
| Name of the Scheme : SBM 2.0 | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 110 | Remove the Leagcy Waste dumped (approximately 29790 CU.M) throough BIO Mininng process in Chidambaram Municipality | Roc No: 9512/2022/SBM1-1 | 20/Jun/2022 | 213.05 | 001/2022/DO1 | 20/Jul/2022 | 213.05 | 05/Aug/2024 | 05/Aug/2024 | 6 Months | 123 | 100 | completed | 164 | 0.00 | 05/Feb/2025 |
| 111 | CONSTRUCTION OF NEW PUBLIC TOILET AT CHIDAMBARAM BUS STAND | 499/2022/B1 | 01/Sep/2022 | 34 | 499/2022/B1 | 05/Sep/2022 | 34 | 06/Oct/2022 | 06/Oct/2022 | 270 days | 22.5 | 100 | completed | 34 | 100.00 | 06/Feb/2023 |
| 112 | Construction of Material recovery Center in C.Thandeshwaranallur 3MT Micro Composting Yard ( S.No.198/18, S.No.6/4 ) | Roc.No.1280/2022/B1 | 21/Dec/2022 | 26 | 2022-23/ME | 27/Dec/2022 | 26 | 27/Jan/2023 | 27/Jan/2023 | 270 days | 26 | 100 | completed | 25.34 | 0.00 | 27/Apr/2023 |
| 113 | Construction of Sepatage receiving chambaer -Decanting system at Sewage treatment plant at Main Pumping station in Chidambaram Municipality | 1280/2022/b1/2 | 20/Jun/2023 | 9 | 15/2023-24/ME | 27/Jun/2023 | 9 | 14/Jul/2023 | 14/Jul/2023 | 90 Days | 9 | 100 | completed | 8.06 | 89.60 | 12/Oct/2023 |
| 114 | Construction of Community toilet at Kanniraman Street ward no.1 | 5992/2022/SBM2 | 08/Sep/2023 | 19.28 | 28/2023-24-ME | 16/Oct/2023 | 19.28 | 05/Dec/2023 | 05/Dec/2023 | 6 Months | 19.28 | 100 | completed | 18.88 | 97.94 | 05/Jun/2024 |
| 115 | Construction of Public Toilet at North Main Road and Fish Market Ward No.04 in Chidambaram Municipality | RDMA Roc No. 2090/2022/A1 | 10/Oct/2024 | 44 | 44/2024-25/RE | 10/Oct/2024 | 44 | 06/Dec/2024 | 06/Dec/2024 | 4 Months | 44 | 100 | Completed | 43.81 | 99.56 | 06/Apr/2025 |
| 116 | Construction of Community Toilet at Ponnamalam Nagar(Karaikuttai Kulam near),Ward No.29 and at Ambedkar Nagar,Ward No.04 and Railway Feeder Road(PDS Shop near),Ward No.33 in Chidambaram Municipality | RDMA Roc 2090 /2022/A1 | 10/Oct/2024 | 54 | 46/2024-25/RE | 10/Oct/2024 | 54 | 06/Dec/2024 | 06/Dec/2024 | 270 Days | 54 | 97 | Plastering and Tiles laying work is in progress. | 46.31 | 0.00 | 02/Sep/2025 |
| 117 | Repair and Maintenance works of Public Toilet at ThillaiKalliyamman Kovil street,Ward No.05 in Chidambaram Municipality | RDMA Roc No. 2090/2022 /A1 | 10/Oct/2024 | 4 | 34/2024-25/ME | 10/Oct/2024 | 4 | 06/Dec/2024 | 06/Dec/2024 | 270 days | 4 | 100 | COMPLETED | 4 | 0.00 | 05/Jan/2025 |
| 118 | Construction of Public Toilet at GH Campus,Ward No.23 in Chidambaram Municipality | 2090/2022/A2 | 27/Mar/2025 | 57 | 59/2024-25/RE | 02/Apr/2025 | 57 | 28/May/2025 | 28/May/2025 | 6 Months | 57 | 100 | completed | 35 | 0.00 | 28/Nov/2025 |
| Name of the Scheme : SFC (Incentive Fund) | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 119 | Providing Ornamental Light works in Car Street and Bus Route Roads in Chidambaram Municipality | 23045/2023/SS2 | 30/Jun/2023 | 131 | /2023-24/CE | 09/Aug/2023 | 131 | 10/Oct/2023 | 10/Oct/2023 | 9 Months | 131 | 100 | Completed | 128.5 | 98.09 | 10/Jul/2024 |
| Name of the Scheme : SFC ARREAR FUND | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 120 | CONSTRUCTION OF STORM WATER DRAIN AND FOOTPATH AT SOUTH AND WEST CAR STREET IN CHIDAMBARAM MUNICIPALITY | 23045 /2023/ SS2 | 30/Jun/2023 | 995 | 182/2023-24 | 28/Aug/2023 | 995 | 25/Oct/2023 | 25/Oct/2023 | 9 Months | 995 | 38 | Out Of 2269 M,1580 M Drain Work Completed and 1450 M Tiles laying work completed SS hand rail work 320M completed. (Work dropped letter sent to DMA office) | 273.38 | 0.00 | 25/Jul/2024 |
| Name of the Scheme : SFC -SCHOOL IMPROVEMENT GRANT – INFRASTRUCTURE WORKS | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 121 | Construction of New Toilet at Malaikatti Street Municipal Middle School at ward 23 | 6002/2023/SS2 | 25/Oct/2023 | 18.5 | 65/2023-23/ME | 18.5 | 27/Nov/2023 | 27/Nov/2023 | 90 Days | 0 | 100 | completed | 18.09 | 0.00 | 25/Feb/2024 | |
| 122 | Construction of Additional Class room at First floor and toilet in ground and first floor at malaikatti middle school in chidambaram municipality | CMA ROC NO. 21615/2024/SS2 | 22/Jul/2024 | 57 | /2024-25/RE | 24/Jul/2024 | 57 | 22/Aug/2024 | 22/Aug/2024 | 270 Days | 57 | 100 | Completed | 57 | 0.00 | 19/May/2025 |
| 123 | Construction of 2+2 class room at Kothangudi Municipal middle school in chidambaram municipality | CMA ROC NO. 21615/2024/ SS2 | 22/Jul/2024 | 52.5 | /2024-25/RE | 24/Jul/2024 | 52.5 | 22/Aug/2024 | 22/Aug/2024 | 6 Months | 52.5 | 100 | Physically completed | 52.5 | 100.00 | 22/Feb/2025 |
| 124 | Construction of Kothangudi Street Anganwadi in chidambaram municipality | 9732/2025/SS2 | 25/Jul/2025 | 18 | 24/2025-26/ME | 28/Jul/2025 | 18 | 0 | 0 | 0 | Tender called on 22.08.2025 | 0 | 0.00 | |||
| Name of the Scheme : SFC -SCHOOL IMPROVEMENT GRANT-O&M WORKS | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 125 | Improvement Work at Municipal High School in Chidambaram Municipality Ward No. 2 | 6003/2023/SBM2 | 25/Oct/2023 | 22 | 66/2023/ME | 25/Oct/2023 | 22 | 27/Nov/2023 | 27/Nov/2023 | 60 Days | 22 | 100 | completed | 21.88 | 99.45 | 26/Jan/2024 |
| 126 | Improvement work at Malaikatti Street Municipal middle school ward no. 23 | 6003 /2023/SS2 | 25/Oct/2023 | 15 | 67/2023/ME | 25/Oct/2023 | 15 | 27/Nov/2023 | 27/Nov/2023 | 90 Days | 15 | 100 | completed | 15 | 0.00 | 25/Feb/2024 |
| 127 | Improvement work at Kanagasabai Nagar Municipal Primary school ward no. 30 | 6003 /2023 / SS2 | 25/Oct/2023 | 8.5 | 68/2023/ME | 25/Oct/2023 | 8.5 | 27/Nov/2023 | 27/Nov/2023 | 60 Days | 8.5 | 100 | completed | 8.5 | 0.00 | 26/Jan/2024 |
| 128 | Improvement work at Municipal middle school at mana lane ward no. 7 | 6003/ 2023/ SS2 | 25/Oct/2023 | 7.5 | 69/2023/ME | 25/Oct/2023 | 7.5 | 27/Nov/2023 | 27/Nov/2023 | 60 Days | 7.5 | 100 | completed | 7.5 | 0.00 | 26/Jan/2024 |
| 129 | Reconstruction of New Toilet at Mana Municipal Middle School at Ward 21 | 25739/2023/SS2 | 26/Dec/2023 | 49 | 87/2023-24/ME | 26/Dec/2023 | 18.5 | 31/Jan/2024 | 31/Jan/2024 | 90 Days | 18.5 | 100 | completed | 13.36 | 0.00 | 30/Apr/2024 |
| 130 | Reconstruction of New Toilet at Kothagudi Municipal Middle School at Ward 21 | 25739/2023/SS2 | 26/Dec/2023 | 49 | 88/2023-24/ME | 26/Dec/2023 | 18.5 | 31/Jan/2024 | 31/Jan/2024 | 90 Days | 18.5 | 100 | completed | 18.5 | 0.00 | 30/Apr/2024 |
| 131 | Improvement Work for East side class Room Building at Municipal Middle School, Mana street (ward no 07) | 25739/2023/SS2 | 26/Dec/2023 | 49 | 89/2023-24/ME | 26/Dec/2023 | 2 | 31/Jan/2024 | 07/Feb/2024 | 30 Days | 2 | 100 | completed | 1.92 | 0.00 | 08/Mar/2024 |
| 132 | Improvement works for Class Room building of Municipal Primary School at North Main Road (Ward No.04) | 25739/2023/SS2 | 26/Dec/2023 | 49 | 90/2023-24/ME | 26/Dec/2023 | 10 | 31/Jan/2024 | 31/Jan/2024 | 60 Days | 10 | 100 | completed | 10 | 0.00 | 31/Mar/2024 |
| 133 | Maintenance Works of Kothangudi Street Municipal Middle School Main Building(North & South side),Ward No.21 in Chidambaram Municipality. | 21616/2024/SS2 | 11/Nov/2024 | 25 | 38/2024-25-ME | 11/Nov/2024 | 25 | 26/Dec/2024 | 26/Dec/2024 | 270 Days | 25 | 100 | completed | 25 | 0.00 | 22/Sep/2025 |
| 134 | Maintenance Works of North Car Street Municipal Middle School Main Building,Ward No.09 in Chidambaram Municipality. | 21616 /2024/SS2 | 11/Nov/2024 | 20 | 39/2024-25-ME | 11/Nov/2024 | 20 | 26/Dec/2024 | 26/Dec/2024 | 4 Months | 20 | 100 | completed | 20 | 100.00 | 26/Apr/2025 |
| 135 | Repair and Maintenace of Anna Kalaiyarangam East Anganwadi at ward no:4 in Chidambaram Municipality | 21616/24/SS2 | 17/Mar/2025 | 7 | 91/2024-25/ME | 17/Mar/2025 | 7 | 15/Apr/2025 | 15/Apr/2025 | 2 Months | 7 | 100 | completed | 4 | 0.00 | 15/Jun/2025 |
| 136 | Repair and Maintenace of Anna Kalaiyarangam Wast Anganwadi at ward no:4 in Chidambaram Municipality | 21616 /24/SS2 | 17/Mar/2025 | 7 | 92/2024-25/ME | 17/Mar/2025 | 7 | 15/Apr/2025 | 15/Apr/2025 | 3 Months | 7 | 100 | completed | 4 | 0.00 | 15/Jul/2025 |
| 137 | Repair and Maintenance of Eda Street Anganwadi in Chidambaram Municipality | 21616/2024 /SS2 | 17/Mar/2025 | 7 | 93/2024-25/ME | 17/Mar/2025 | 7 | 15/Apr/2025 | 15/Apr/2025 | 270 Days | 7 | 100 | completef | 6.97 | 59.71 | 10/Jan/2026 |
| 138 | Repair and Maintenance of kasimkhan pettai Anganwadi in Chidambaram Municipality | 21616/ 2024/SS2 | 17/Mar/2025 | 7 | 94/2024-25/ME | 17/Mar/2025 | 7 | 15/Apr/2025 | 15/Apr/2025 | 3 Months | 7 | 100 | completed | 7 | 100.00 | 15/Jul/2025 |
| 139 | Repair and Maintenance of Sambanthakara Street Anganwadi in Chidambaram Municipality | 21616/2024 / SS2 | 17/Mar/2025 | 7 | 95/2024-25/ME | 17/Mar/2025 | 7 | 15/Apr/2025 | 15/Apr/2025 | 3 Months | 7 | 100 | completed | 7 | 0.00 | 15/Jul/2025 |
| 140 | Construction of Sivagami Amman Koil Street Anganwadi in Chidambaram Municipality | 21616/2024/ SS2 | 17/Mar/2025 | 20 | 90/2024-25/ME | 17/Mar/2025 | 20 | 15/Apr/2025 | 15/Apr/2025 | 3 Months | 20 | 100 | completed | 20 | 100.00 | 15/Jul/2025 |
| 141 | Repair and Maintenance Works of Anganwadi Thirupattan Street in chidambaram municipality | 9733/2025/SS 2-1 | 25/Jul/2025 | 7 | 25/2025 – 1 | 28/Jul/2025 | 7 | 03/Sep/2025 | 03/Sep/2025 | 1 Months | 7 | 100 | completed | 13.3 | 100.00 | 03/Oct/2025 |
| 142 | Repair and Maintenance Works of Anganwadi Chinna kajiyar Street(Kallukadai Street) in chidambaram municipality | 9733/2025 /SS2-2 | 25/Jul/2025 | 7 | 26/2025/26 – 1 | 28/Jul/2025 | 7 | 03/Sep/2025 | 03/Sep/2025 | 1 Months | 7 | 100 | completed | 7 | 100.00 | 03/Oct/2025 |
| 143 | Repair and Maintenance Works of Anganwadi Anandeeshwaran koil Street in chidambaram municipality | 9733 /2025/SS2-3 | 25/Jul/2025 | 7 | 27/2025-26-ME | 28/Jul/2025 | 7 | 03/Sep/2025 | 03/Sep/2025 | 1 Months | 7 | 100 | completed | 7 | 100.00 | 03/Oct/2025 |
| 144 | Repair and Maintenance Works of Anganwadi South Vaniya Street in chidambaram municipality | 9733/2025/SS2-4 | 25/Jul/2025 | 7 | 28/2025-26-ME | 28/Jul/2025 | 7 | 03/Sep/2025 | 03/Sep/2025 | 1 Months | 7 | 100 | completed | 7 | 100.00 | 03/Oct/2025 |
| 145 | Repair and Maintenance Works of Anganwadi Ellamanayakar Koil Madaviligam Anganwadi centre in chidambaram municipality | 9733/2025/SS2-5 | 25/Jul/2025 | 7 | 29/2025-26-ME | 28/Jul/2025 | 7 | 03/Sep/2025 | 03/Sep/2025 | 1 Months | 7 | 100 | completed | 7 | 100.00 | 03/Oct/2025 |
| 146 | Repair and Maintenance Works of Anganwadi VOC Street in chidambaram municipality | 9733/2025/SS2-6 | 25/Jul/2025 | 7 | 30/2025-26-ME | 28/Jul/2025 | 7 | 03/Sep/2025 | 03/Sep/2025 | 1 Months | 7 | 100 | Completed | 7 | 100.00 | 03/Oct/2025 |
| 147 | Repair and Maintenance Works of Anganwadi Mana Sandhu in chidambaram municipality | 9733/2025/SS2-7 | 25/Jul/2025 | 7 | 31/2025-26-ME | 28/Jul/2025 | 7 | 03/Sep/2025 | 03/Sep/2025 | 1 Months | 7 | 100 | Completed | 7 | 100.00 | 03/Oct/2025 |
| 148 | Repair and Maintenance Works of Anganwadi Malaikatti Street in chidambaram municipality | 9733/2025/SS2-8 | 25/Jul/2025 | 7 | 32/2025-26-ME | 28/Jul/2025 | 7 | 03/Sep/2025 | 03/Sep/2025 | 1 Months | 7 | 100 | Completed | 7 | 100.00 | 03/Oct/2025 |
| 149 | Repair and Maintenance Works of Anganwadi Ellamanayakar Koil Street East Side in chidambaram municipality | 9733/2025/SS2-9 | 25/Jul/2025 | 7 | 33/2025-26-ME | 28/Jul/2025 | 7 | 03/Sep/2025 | 03/Sep/2025 | 1 Months | 7 | 100 | Completed | 10 | 100.00 | 03/Oct/2025 |
| Name of the Scheme : SFC-URBAN ROAD DEVELOPMENT FUND | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 150 | Relaying of Road-Cement Concrete Road092005R080-Vadaku Vaduga Street ( W to E ) , 092005S007-Vadaku Vaduga Street Lane (S to N ) , 092007R118-Mana Mettu street ( S to N ) , 092007R129-Karai kattu chokalingam street (From North Main road) ( W to E ) , 092022R226-Kumaran street (W To E) , 092031R295-South Vaniya cross lane (S to W) , | 18thCPSMC Mintues of Meeting | 02/Apr/2025 | 36 | 7/2025-26/ME | 10/Apr/2025 | 36 | 270 days | 0 | 0 | Negotiation Called for L1 Contractor | 0 | 0.00 | |||
| Name of the Scheme : SPECIAL FUND FOR IMPROVEMENT OF ROADS | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 151 | Formation of New Road-Earthern to PaverBlock092001R013-Amsam Nagar (SPF No. 6/CDM/2018 (E to W) , 092032S019-ARANGANATHAN NAGAR , | 18thcpsmc minutes of meeting | 02/Apr/2025 | 5 | 6/2025-26/ME | 10/Apr/2025 | 5 | 09/May/2025 | 09/May/2025 | 3 Months | 5 | 100 | completed | 5 | 0.00 | 09/Aug/2025 |
| Name of the Scheme : State Urban Infrastructure Development Fund | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 152 | Conversion of existing Street Light into Energy Efficient LED Light – 2225 Nos | Roc No.30522/2022/WB | 04/Nov/2022 | 304.47 | 2022-23 | 07/Nov/2022 | 304.47 | 09/Feb/2023 | 09/Feb/2023 | 365 Days | 304.47 | 100 | completed | 298.62 | 0.00 | 09/Feb/2024 |
| Name of the Scheme : TURIP | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 153 | Package – 1 Relaying of Road-Bituminous Road092002R030-Rajalakshmi Nagar 4th Cross ( MCC Opposite road) ( E to W ) , 092002R032-Rajalakshmi Nagar 1st Cross street ( E to W ) , 092003R040-Swathi Nagar 2nd Cross Main road ( S to N ) , 092003R043-Swathi Nagar 2nd Cross Main road 1st Cross ( W to E ) , 092003R050-Aasirwatham Nagar 1st Cross street (S to N ) , 092003R049-Aasirwatham Nagar Main road ( E to W ) , 092004R056-MGR Nagar Main Road ( E to W ) , 092006R084-Vengan 2nd street ( E to W | CMA Roc No. 9730/2025/SS1 | 26/Dec/2025 | 198.83 | 2025-26/CE | 198.83 | 09/Feb/2026 | 09/Feb/2026 | 3 Months | 0 | 100 | completed | 198.83 | 100.00 | 09/May/2026 | |
| 154 | Package – 2 Relaying of Road-Bituminous Road092021R214-Gandhi Nagar Main road. (N To S) , 092022R227-Anna street (N To S) , 092024R235-Malakatti street (E to W) , 092026R244-Mannarkudi Street (E to W ) , 092027R255-Angalamman koil street (N to S ) , 092031R294-South Vaniya Street (W to E) , 092031R303-Kanagasabai Nagar 6th Cross street ( E to W) , 092031R300-Kanagasabai Nagar 3rd Cross street ( E to W) , 092031R304-Kanagasabai Nagar 7th Cross street ( E to W) , 092032R311-Kanagasabai Nagar 1st | CMA Roc No 9730/2025/SS1 | 26/Dec/2025 | 279.67 | /2025-26/CE | 279.67 | 09/Feb/2026 | 09/Feb/2026 | 3 Months | 0 | 100 | completed | 249.88 | 0.00 | 09/May/2026 | |
| Name of the Scheme : WATERSUPPLY | ||||||||||||||||
| Name of the Muncipality : CHIDAMBARAM | ||||||||||||||||
| 155 | Pumping main and distribution main leakage arresting work at Vakkaramari head works in Chidambaram Municipality | MCR No. 323 | 30/Apr/2025 | 9.5 | 61/2025-26-ME | 22/Dec/2025 | 9.5 | 23/Feb/2026 | 23/Feb/2026 | 6 Months | 9.5 | 100 | completed | 0 | 0.00 | 23/Aug/2026 |
| 156 | Leak arrested of Water Supply Distribution pipe line and UGD pipe at Ward No. 16 to 33 in Chidambaram Municipality | MCR No. 400 | 17/Oct/2025 | 9 | 59/2025-26-Me | 22/Dec/2025 | 9 | 23/Feb/2026 | 23/Feb/2026 | 6 Months | 9 | 100 | completed | 4.39 | 0.00 | 23/Aug/2026 |
| 157 | Leak arrested of Water Supply Distribution pipe line and UGD pipe at Ward No. 1 to 15 in chidambaram municipality | MCR No. 399 | 17/Oct/2025 | 9 | 58/2025-26-ME | 22/Dec/2025 | 9 | 23/Feb/2026 | 23/Feb/2026 | 6 Months | 9 | 100 | completed | 0 | 0.00 | 23/Aug/2026 |
| 158 | Maintenance and repairs of Borewell motor pumpsets at various places in chidambaram municipality | MCR NO. 281 | 24/Feb/2025 | 9.9 | 60/2025-26-ME | 22/Dec/2025 | 9.9 | 23/Feb/2026 | 23/Feb/2026 | 6 Months | 9.9 | 100 | completed | 3.92 | 0.00 | 23/Aug/2026 |
| 27×26 | ||||||||||||||||
REGION NAME : CHENGALPET
MUNICIPALITY NAME : CHIDAMBARAM
15 CFC 21-22 NNT 22-23 15TH CFC 22-23 TIDE GRANT SBM 22-23 15TH CFC 22-23 MLA CDS 21-22 WS STATUS CGF 21-22 CGF 23-24 SUIDF 22-23
SFC ARREAR 15TH CFC 22-23 I & A 22-23 15 CFC 21-22 NSMT 22-23 KNMT PARK 22-23 CM Breakfast KNMT WB NNT 22-23.PHASE II
TOILET BIO MINING KNMT – AMRUT NNT knmt pond Market Crematorium knmt park Workwise