Sewerage

SEWERAGE EXISTING SITUATION

UNDER GROUND DRAINAGE SYSTEM IS OPERATIONAL IN ALL THE 27 WARDS OF TIRUVALLUR MUNICIPALITY

DATE OF INAUGURATION
26-06-2014
TECHNOLOGY USED AND CAPACITY OF STP MBBR AND 6.20 MLD
NUMBER OF LIFTING STATION 5
NUMBER OF PUMPING STATION 4
LENGTH OF SEWER MAINS 85.542 KM
TOTAL NUMBER OF MANHOLES 10387
LENGTH OF PUMPING MAINS 8.760 KM
TOTAL NUMBER OF CONNECTIONS AS PER DPR
8618