Installation cost |
Rs.52.01 Crore |
Population (2011 Census) |
4,74,838 |
Date of commencement |
01.04.2007 |
Date of completion of maintenance |
31.03.2012 |
Present Supply of water |
100.00 LPCD |
Sewerage contribution |
63.19 LPCD |
Sewerage flow at present (2014) |
8.5 MLD |
Intermediate (2008 as per design ) |
24.20 MLD |
Ultimate (2033) |
38.55 MLD |
Length of Sewers Main |
187 Km |
Pumping station |
4 Nos |
Length of pumping main |
11.45 Km |
STP (Ramaiyanpatti) |
1 No. |
Waste Stabilization pond |
8 No |
UGD connections (OLD UGD) |
26555 Nos |
Installation cost |
Rs.1.13 Crore |
Area covered |
Tirunelveli Town & Palayapettai |
Date of commencement |
1989 |
No.of House Service connections |
1498 |
Pumping station |
Nainarkulam |
Disposal point |
Oxidation pond at Ramaiyanpatti & now linked to STP site |
STORM WATER DRAIN |
299.45 KM |