Sewerage Existing Situation
The project was inaugurated by the Honorable Chief Minister of Tamil Nadu on 26.06.2014 and is in the public use. The wastewater treatment plant is also functioning well with the Tamil Nadu Drinking Water Board. The Project cost was 96.01 crore.
In this system, municipal area has been divided into 5 zones for purpose administrative ground, 2445 manholes are allowed and the length of pipes laid as 67.64 km. A total of 5617 household pipelines are installed, 15 sewage pumping stations, 5 sewage treatment plants and all sewage treatment facilities being purified at Kekkarai (STP site capacity of 6.92MLD), 5 km from Thiruvarur.