- Storm Water Drain
Core Area –- Construction of Storm Water Drains (Road Drains) of various sizes, (Rectangular / Open / Covered drain), in RCC, M25 including necessary Earth work excavation, Reconstruction of Dilapidated Storm Water Drains
- Construction of Kerb & Gutter of various sizes, in PCC M20
- Construction of Culverts of various sizes at road junction & crossing with RCC mix M25 including Replacement of Inadequate Culvert Section etc.,
- Desilting and Widening of Vaaris –
- Storm Water Drain
Added Area –
-
-
- Construction of Storm Water Drains (Road Drains) of various sizes, (Rectangular / Open / Covered drain), in RCC, M25 including necessary Earth work excavation, Reconstruction of Dilapidated Storm Water Drains
- Construction of Kerb & Gutter of various sizes, in PCC M20
- Construction of Culverts of various sizes at road junction & crossing with RCC mix M25 including Replacement of Inadequate Culvert Section etc.,
- Desilting and Widening of Vaaris –
-