The existing status of roads in this town are
| Roads | Kms | ||
| Black Top | 5 | ||
| Cement Concrete | 16 | ||
| Earthen | 80 | ||
| Total | 31.01 | ||
| Total Length of Highways | — | ||
| Total Length of NH | — | ||
| Ranipet District | ||||||||||||
| SHOLINGHUR TOWN | ||||||||||||
| ROAD DETAILS AS ON 01.04.2020 AT THE END OF FINANCIAL YEAR 2019-2020 | ||||||||||||
| SL.NO | Type of RoadS | Total no of Roads | Road length as on 1.04.2019 (Opening Balance) |
Works completed during the year | Road length as on 31.03.2020(Closing Balance) | Remarks | ||||||
| No of Roads | Length (KM) | Name of Scheme | Difference | Additional roads handed over to ULB(Layout/Gifted/others) in KM | ||||||||
| (+) Km | (-) Km | Same(No Change) Km | ||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | |
| 1 | BT ROAD | 26 | 5.05 | 0 | 0.000 | 0 | 0 | 0.000 | 0.00 | 0 | 5.05 | |
| 2 | CC ROAD | 238 | 27.16 | 0 | 0.000 | 0 | 0 | 0.000 | 0.00 | 0 | 27.16 | |
| 3 | WBM ROAD | 0 | 0.00 | 0 | 0.000 | 0 | 0 | 0.000 | 0.00 | 0 | 0.00 | |
| 4 | PAVER BLOCK ROAD | 0 | 0.00 | 0 | 0.000 | 0 | 0 | 0.000 | 0.00 | 0 | 0.00 | |
| 5 | GRAVEL ROAD | 0 | 0.00 | 0 | 0.000 | 0 | 0 | 0.000 | 0.00 | 0 | 0.00 | |
| 6 | EARTHEN ROAD | 72 | 5.80 | 0 | 0.000 | 0 | 0 | 0.000 | 0.00 | 0 | 5.80 | |
| TOTAL | 336 | 38.01 | 0 | 0.000 | 0 | 0 | 0.000 | 0.00 | 0 | 38.01 | ||