| Source | Cauveri River |
| Location | Moahanur |
| Distance | 18 K.M. |
| Year of Commissioning | 2010 |
| Installed capacity | 9.58 MLD |
| Designed up to ultimate with population | 2025 |
| Head works infiltration well | 13 Nos |
| Collection Well | 3 Nos. |
| No. of Over Head Tanks with Capacity | |
| 160 Nos. | 82.34 Lakhs Litre |
| No. of Distribution Zone | 296 Nos. |
| Length of Pumping Main | 61.44 K.M. |
| Total Distribution Main | 216.51 K.M. |
| Total No. of Public Fountain | 7568 Nos. |
| Motors Details | Head works |
| 126 HP Submersible – 1 | |
| 75 HP V.Turbine – 2 | |
| 60 HP Turbine – 1 | |
| Booster Station
60 HP – 2 40 HP-1 Motor Sump 40 HP – 1 30 HP – 1 25 HP – 1 |
|
| Pumping Details | |
| Head works | 9.58 + 2.00 MLD |
| Local Sources | 0.30 MLD |
| LPCD Frequency | 98 LPCD |
| Frequency | 3 days once |
| No. of Mini Power Pump | 197 Nos. |
| No. of Hand Pump Bore Well | 140 Nos. |
| No. of Open Wells | 34 Nos. |
| No. of Water Supply Lorry | 2 Nos. |
| Total No. of House Service Connections | |
| Domestic | 21943 Nos. |
| Non Domestic | 1577 Nos. |
| Total | 23520 Nos. |