NAGERCOIL CITY MUNICIPAL CORPORATION
YEAR 2019-20 | |||||
Sl. No. | Scheme | Name Of the Work | Est. amt | Expenditure | Stage of work |
1 | TURIP 2019-20 | Providing BT surface using CMP at Panchapandavar kovil Road in Ward No.1, Rajeevnagar in Ward No.38, Vaithiyanathapuram Channelkarai in Ward No.38 & 48 | 100.00 | 80.09 | Completed |
2 | MLA 2019-20 | Providing BT surface at Sathirapathi Sivaji salai in Ward No.22 | 5.00 | 4.92 | Completed |
3 | MLA 2019-20 | Providing BT surface at Azad Nagar in Ward No.19 | 7.50 | 7.50 | Completed |
4 | 14th CFC 2019-20 | Providing Paver block at Thalavai Street in Ward No.10 | 25.00 | Not Started | |
5 | 14th CFC 2019-20 | Providing BT surface using CMP at Gnanam Colony Main road in Ward No.22 | 24.00 | WMM work is in progress | |
6 | 14th CFC 2019-20 | Providing BT surface at Thamathukonam to Melatharavilai in Ward No.22 | 25.00 | Not started | |
7 | 14th CFC 2019-20 | Providing BT surface at Gandhi Colony in Ward No.23 | 24.00 | Work Completed | |
8 | 14th CFC 2019-20 | Providing BT surface using CMP at Erulappapuram Main Road in Ward No.38 | 25.00 | Not started | |
9 | 14th CFC 2019-20 | Providing BT surface at Golden Street in Ward No.25 | 21.00 | Not started | |
10 | 14th CFC 2019-20 | Providing BT surface at Erulappapuram Sivan kovil salai in Ward No.38 | 25.00 | Not started | |
11 | 14th CFC 2019-20 | Providing BT surface at V.N.Colony in Ward No.38 | 25.00 | Work Completed | |
12 | 14th CFC 2019-20 | Providing BT surface at Ponnappanadar Colony Cross Street in Ward No.42 | 25.00 | Not started | |
13 | 14th CFC 2019-20 | Providing BT surface at Nesamony Nager in Ward No.43 | 25.00 | Not started | |
14 | 14th CFC 2019-20 | Providing BT surface using CMP at Velladichivilai in Ward No.19 | 25.00 | VMM work is in progress | |
15 | 14th CFC 2019-20 | Providing BT surface at Kamarajar Salai in Ward No.19 | 25.00 | Picking in progress | |
16 | 14th CFC 2019-20 | Providing BT surface at Carmel Mount Road in Ward No.42 | 25.00 | Not started | |
17 | 14th CFC 2019-20 | Providing BT surface at Distillery Road in Ward No.28 | 25.00 | Not started | |
18 | 14th CFC 2019-20 | Providing BT surface at Thalavaipuram Road in Ward No.51 | 25.00 | Not started | |
19 | 14th CFC 2019-20 | Providing BT surface at Vakaiyadi Rathaveethi in Ward No.16 | 25.00 | Not started | |
20 | 14th CFC 2019-20 | Providing BT surface at Puthu Theru in Ward No.38 | 25.00 | Not started | |
21 | 14th CFC 2019-20 | Providing BT surface at Thaddi Deppo Road in Ward No.43 | 25.00 | Not started | |
22 | 14th CFC 2019-20 | Providing BT surface at Maravankudieruppu Kalai Nager in Ward No.39 | 25.00 | Not started | |
23 | 14th CFC 2019-20 | Providing BT surface at Old State Bank Colony in Ward No.52 | 25.00 | Not started | |
24 | 14th CFC 2019-20 | Providing BT surface using CMP at Ganesapuram Road in Ward No.36 | 25.00 | Not started | |
25 | 14th CFC 2019-20 | Providing BT surface using CMP at Vattavilai Main Road in Ward No.38 | 25.00 | Not started | |
26 | 14th CFC 2019-20 | Providing BT surface at Erullappapuram Park to Vattavilai Health Centre in Ward No.38 | 25.00 | Not started | |
27 | 14th CFC 2019-20 | Providing BT surface using CMP at Thollavilai Main Road in Ward No.40 | 25.00 | Not started | |
28 | 14th CFC 2019-20 | Providing BT surface at A R Camp to Kurusadi Road in Ward No.41 | 25.00 | Not started | |
29 | 14th CFC 2019-20 | Providing BT surface at Konam Melasoorankudi Channel Karai Road in Ward No.22 | 25.00 | Picking in Progress | |
30 | 14th CFC 2019-20 | Providing BT surface at Kottavilai in Ward No.24 | 25.00 | Not started | |
31 | 14th CFC 2019-20 | Providing BT surface at Holly Cross Road in Ward No.41 | 24.00 | Work completed | |
32 | 14th CFC 2019-20 | Providing BT surface at Ponnappanadar Main Road in Ward No.42 | 25.00 | Work completed | |
33 | 14th CFC 2019-20 | Providing BT surface at Thazuviya Mahadever Kovil in Ward No.8 | 25.00 | Not started | |
34 | 14th CFC Savings Fund 2019-20 | Providing BT surface at Kulathoor Channel Karai in Ward No.12 | 24.90 | Tender received subject placed before the Council | |
35 | 14th CFC Savings Fund 2019-20 | Providing BT surface at Kulathoor CSI Church Road in Ward No.12 | 19.50 | Subject placed to Council | |
36 | 14th CFC Savings Fund 2019-20 | Providing BT surface at Sastha Nagar in Ward No.12 | 9.80 | Subject placed to Council | |
37 | 14th CFC Savings Fund 2019-20 | Providing BT surface at Sabayarkulam in Ward No.12 | 23.10 | Subject placed to Council | |
38 | 14th CFC Savings Fund 2019-20 | Providing BT surface at Chetti Street near Government School in Ward No.20 | 23.10 | Subject placed to Council | |
39 | 14th CFC Savings Fund 2019-20 | Providing BT surface at South Kanna Kulam in Ward No.20 | 25.00 | Subject placed to Council | |
40 | 14th CFC Savings Fund 2019-20 | Providing BT surface at ISED nagar South in Ward No.20 | 18.10 | Subject placed to Council | |
41 | 14th CFC Savings Fund 2019-20 | Providing BT surface at ISED nagar Norht in Ward No.20 | 18.10 | Subject placed to Council | |
42 | 14th CFC Savings Fund 2019-20 | Providing BT surface at BISMI Nagar in Ward No.20 | 21.00 | Subject placed to Council | |
43 | 14th CFC Savings Fund 2019-20 | Providing BT surface at North Soorankudy Society Road to Jamath in Ward No.21 | 18.50 | Subject placed to Council | |
44 | 14th CFC Savings Fund 2019-20 | Providing BT surface at S.T.M. Mandapam to Ayyapa Nagar in Ward No.21 | 18.50 | Subject placed to Council | |
Ongoing work list | |||||
45 | MLA 2019-20 | Construction of Ration shop at Erumbukadu in Ward No.22 | 5.00 | Brick work in progress | |
46 | MLA 2019-20 | Construction of Busshelter infront of Concordia School in Ward No.43 | 2.00 | Awaiting for permission from NH | |
47 | MLA 2019-20 | Providing 2 Nos of Solar Light in Thazliyapuram Park in ward No.30 | 1.00 | Progress | |
48 | MLA 2019-20 | Construction of Kalaiarangam near Library Building at Holy Cross Nagar in Nagercoil Corporation | 4.00 | Painting work progress | |
49 | MLA 2019-20 | Construction of Kalaiarangam Ozhuhinasery near Engodi Kanda Sastha Samayal Koodam in Nagercoil Corporation | 4.00 | Not started | |
50 | MLA 2019-20 | Providing BT surface at Rahamath Garden in Ward No.19 | 5.00 | Not started | |
51 | MLA 2019-20 | Providing Paver block at Parameswaran street in Ward No.26 | 5.00 | Not started | |
52 | MLA 2019-20 | Providing drainage work at Ramavarmapuram Puthu theru and near Ramalekshmi Thirumana Mandapam in Ward No.30 | 1.25 | Not started | |
53 | MLA 2019-20 | Providing 1 No of Solar Light in Vadasery Gandhi park in Ward No.8 | 0.50 | Progress | |
54 | MLA 2019-20 | Providing Paver block and Play Material arrangements at Simon Nager children’s play ground in Ward No.43 | 6.50 | Tender received on 19.03.2020 | |
55 | MLA 2019-20 | Providing Paver block infront of Yuga Seva Hospital Street in Ward No.18 | 2.50 | Tender received on 19.03.2020 | |
56 | MLA 2019-20 | Providing drainage at Asaripallam Medical College East side in Ward No.23 | 1.50 | Tender received on 19.03.2020 | |
57 | MLA 2019-20 | Providing Paver block at Ayisha Avenue in Ward No.19 | 2.00 | Tender received on 19.03.2020 | |
58 | MLA 2019-20 | Providing BT surface at Keezha Asaripallam Channel Karai in Ward No.23 | 5.00 | Tender received on 19.03.2020 | |
59 | MLA 2019-20 | Providing Roof sheet shed work at Arunthathiyar Social Community Hall in Nagercoil Corporation at Ward No.47 | 4.00 | Tender received on 19.03.2020 |
YEAR 2018-19 | |||||
Sl. No. | Scheme | Name Of the Work | Est. amt | Expenditure | Stage of Work |
1 | TURIP 18-19 | Providing BT surface using CMP in S.P.Quarters road in w.no:42, Puthan Bunglow road in w.no:31, Ananthanar Channel in w.no:22, Vadalivilai, Esakanvilai and vadalivilai south street in w.no:37, BT surface using CMP and paverblock road at Aruthathiyar colony in w.no:38 in ngl Municipality | 130.00 | 128.91 | Completed |
2 | CSR 18-19 | Improvement works such as meditation hall, toilet block and compound wall to Gasifier crematorium at Puliyadi | 98.50 | 98.50 | Completed |
3 | CGF 18-19 | Construction of new office building at Kalaivanar Kalairagam at ngl Municipality | 500.00 | 170.06 | IVth floor column Raising work is in progress |
4 | SWM 18-19 | Removal the legacy waste dumped in compost yard at valampurivilai through Bio-mining process (Legacy Waste Volume in 153000 cum) in Nagercoil City Municipal Corporation | 1007.00 | LTCT supply received and heaping work is going on |
|
5 | SWM 18-19 | Construction of Micro Compost Centre with processing capacity of 5TPD at Puliyadi in ward no.7 | 60.00 | 60.00 | Completed |
6 | SWM 18-19 | Construction of MCC with a Capacity of 5TPD with necessary compound wall at Vattavilai in Nagercoil Municipality | 97.00 | 95.00 | Completed |
7 | SWM 18-19 | Construction of Micro Compost Centre with processing capacity of 5TPD at Vattavilai near Suriya Nager in ward no.38 | 60.00 | 30.00 | Completed |
8 | SWM 18-19 | Construction of Micro Compost Centre with processing capacity of 5TPD at Aanathaimadam in ward no.48 | 60.00 | 60.00 | Completed |
9 | SWM 18-19 | Construction of Micro Compost Centre with processing capacity of 5TPD at Kottar Lorry Stand in ward no.33 | 60.00 | 47.90 | Completed |
10 | SWM 18-19 | Construction of MCC with a capacity of 5TPD with necessary compound wall and cement concreted approach road in Municipal compost yard at Nagercoil Municipality | 142.60 | 45.54 | Completed |
11 | SWM 18-19 | Construction of Micro Compost Centre with processing capacity of 5TPD at Near Vadasery Busstand in ward no.29 | 60.00 | 60.00 | Completed |
12 | SWM 18-19 | Construction of MCC with a capacity of 5TPD with necessary compound wall in NGO Colony in Nagercoil Municipality | 80.00 | 54.55 | Alternative site selected work Completed |
13 | SWM 18-19 | Construction of MCC with a capacity of 5TPD with necessary compound wall in Housing board in Nagercoil Municipality | 89.00 | 89.00 | Completed |
14 | SWM 18-19 | Construction of MCC with a capacity of 5TPD with necessary compound wall at Paravathipuram Arachar land in Nagercoil Municipality(RE) Maharaja sree avitam Thirunal shelter ground | 80.00 | 78.78 | Completed |
15 | SWM 18-19 | Construction of Micro Compost Centre with processing capacity of 5TPD at Saraloor in ward no.48 | 60.00 | 60.00 | Completed |
16 | MP 18-19 | Providing Borewell at Ammankovil in w.no:5 | 2.00 | 1.34 | Completed |
17 | MP 18-19 | Construction of drain at Thilagar street near pilliyar coil in w.no:31 | 3.00 | 2.83 | Completed |
18 | MP 18-19 | Construction of community hall at Uchimahali ammankovil theru in w.no:33 | 4.00 | 4.00 | Completed |
19 | MP 18-19 | Construction of lab at Thollavilai near PHC | 6.00 | 6.00 | Completed |
20 | MP 18-19 | Constuction of Community hall at Kuran theru w.no:34 | 8.00 | 8.00 | Completed |
21 | MP 18-19 | Consturction of Drainage at w.no:25 Nesavalar colony to Ranithotham salai | 5.00 | 4.39 | Completed |
22 | MP 18-19 | Construction of community hall at Nesavalar colony in w.no:25 | 8.00 | 8.00 | Completed |
23 | MP 18-19 | Construction of Kalairagam Thammathu konam sivasudalaiyandi thirukovil in w.no:5 | 5.00 | 5.00 | Completed |
24 | MP 18-19 | Construction of community hall at Krishnankovil viswaprema santhnamariya community at w.no:29 | 5.00 | 5.00 | Completed |
25 | MP 18-19 | Construction of community hall at first floor near vathiyarvilai Narayaswamy in w.no: | 5.00 | 4.90 | Completed |
26 | MLA 18-19 | Providing coated macadam and renewal BT at Keezha Asaripallam kovil street in w.no:23 | 5.00 | 4.72 | Completed |
27 | MLA 18-19 | Providing chanlinks compoundwall and playing material in simon nager park in w.no:43 | 2.50 | 2.50 | Completed |
28 | MLA 18-19 | Providing paverblcok at vattakarai south street in w.no:40 | 1.00 | 1.00 | Completed |
29 | MLA 18-19 | Providing BT surface at Chistober nager CSI church road in w.no:24 | 5.00 | 4.63 | Completed |
30 | MLA 18-19 | Providing Renewal BT surface at Hanifa nager in w.no:25 | 5.00 | 4.86 | Completed |
31 | MLA 18-19 | Proviidng renewal BT suface at RC Kovil west to manokaran cottage in w.no:19 | 3.00 | 3.00 | Completed |
32 | MLA 18-19 | Providing Paverblock at Kattayan vilai ammancoil North street in w.no:1 | 0.60 | 0.60 | Completed |
33 | MLA 18-19 | Providing shed near kariyamanikapuram street in w.no:12 | 2.00 | 2.00 | Completed |
34 | MLA 18-19 | Providing of drainage and culvert at sagotharar street in w.no:46 | 0.40 | 0.40 | Completed |
35 | MLA 18-19 | Providing cement concrete pavement at Kariyamanikka puram in w.no;12 | 1.50 | 1.50 | Completed |
36 | MLA 18-19 | Providing Paverblock at Maravankudiruppu St.Mari primary school salai | 5.00 | 4.34 | Completed |
37 | MLA 18-19 | Constn.of Compoundwall and Providing Sports Equipments at Vettoornimadam Asirvvathamnagar | 2.00 | 2.00 | Completed |
38 | MLA 18-19 | Constn.of Slab culvert at 31st ward near Vallimadathammancoil | 2.00 | 2.00 | Completed |
39 | MLA 18-19 | Providing new borewell at 1st ward Parameswaran street | 2.50 | 2.50 | Completed |
40 | MLA 18-19 | Construction of Retaining wall at Malikthinar new street in w.no:38 | 1.00 | 0.57 | Completed |
41 | MLA 18-19 | Constn.of Passenger waiting shed at 43 ward near Ranithottam TNSTC | 3.00 | 3.00 | Completed |
42 | MLA 18-19 | Providing drainage on Subhaiyar kulam area at w.no:27&28 | 5.60 | 5.35 | Completed |
43 | MLA 18-19 | Construction of Ladder in OHT at annai Therasa street Ponnappa Nadar colony in w.no:42 | 1.00 | 0.35 | Completed |
44 | MLA 18-19 | Purchasing of playing materials at materials at kalai nager Mutharamman kovil in w.no:39 | 1.50 | 1.50 | Completed |
45 | MLA 18-19 | Const. of dariange and BT road at 40th ward Thollavilai | 5.00 | Cancelled | |
46 | MLA 18-19 | Purchasing of playing materials at kurun theru park in w.no:34 | 1.50 | 0.87 | Completed |
47 | MLA 18-19 | Providing new borewell at 38th ward Vallankumaravilai | 0.60 | Cancelled | |
48 | MLA 18-19 | Constn.of Waiting shed and Flooring at Ananthannagar | 0.75 | 0.73 | Completed |
49 | MLA 18-19 | Providing drainage at Ponnappanadar colony carmel mound road RC church in w.no:42 | 2.00 | 2.00 | Completed |
50 | MLA 18-19 | Const. of Entrance Arch at Nagercoil 39th ward | 5.00 | Cancelled | |
51 | MLA 18-19 | Providing BT surface at Velladichivilai Ramya Hospital street in w.no:19 | 1.25 | 1.25 | Completed |
52 | MLA 18-19 | Providing paverblock at Maravankudiyerup pu street infront st Mary primary school road in w.no:39 | 1.00 | 1.00 | Completed |
53 | MLA 18-19 | Construction of Anganwadi at Kurun theru in w.no:34 | 7.00 | 7.00 | Completed |
54 | MLA 18-19 | Providing Paver Block at MS Road Yathavar Street in Ward No.1 |
2.00 | 0.74 | Completed |
55 | MLA 18-19 | Providing drainage work at St Mary’s Street Ramanputhur in Ward No.52 |
4.50 | 4.50 | Completed |
YEAR 2017-18 | |||||
Sl. No. | Scheme | Name Of the Work | Est. amt | Expenditure | Stage |
1 | AMRUT 17-20 | Beautification of Puliyadi Park | 91.121 | 91.12 | Completed |
2 | AMRUT 17-20 | Beautification of Mukkadal Dam Park Phase III | 96.211 | 95.96 | Completed |
3 | AMRUT 17-20 | Beautification of VN Colony Park | 33.451 | 32.00 | Completed |
4 | AMRUT 17-20 | Beautification of Rajeev Nager Park | 35.201 | 24.35 | Completed |
5 | TRUIP 17-18 | Providing BT surface using CMP in Vadeeswaram Rathaveethi south car st, Keelasarakkalviloai sundraligam theru, Sarakkalvilai sudalimadan swamy kovil back road (near Vivekanathasalai P.No:w 19/631), CMC Nager, Malikthinar, Pavalar theru, Vallankumaravilai jn to Thollavilai jn (Channel karai road), Kamarajar st & Louis street, west vellalar colony and sree devi Mutharammankovil st at w.no:11,19,22, 38, 39, 41,44,46,49 and paverblcok at Parameswaran street and Jothi st in w.no:1&26 |
300.00 | 237.81 | Completed |
6 | SDRF 17-18 | Providing Coated Macadam and Renewal BT at Melaramanputhoor jn near MGR statue in w.no:51 | 8.00 | 5.55 | Completed |
7 | SDRF 17-18 | Providing coated macadam and renewal BT at Kuran theru park in w.no:34 | 8.00 | 4.39 | Completed |
8 | SDRF 17-18 | Proviidng coated macadam and renewal BT at Keela konam channel karai road in w.no:42 | 8.00 | 8.00 | Completed |
9 | SDRF 17-18 | Proviidng BT patches at Dennission raod, Kalkovil road, palace road, christhu nager road, Natukattu ammankovil to asaripallam road, Thollavilai channel road, Kurusady churc to punnai nager jn road in ngl municipality | 10.00 | 10.00 | Completed |
10 | SDRF 17-18 | Providing Interlock and drainage maintenance at Palace road in w.no:45 | 19.00 | 18.56 | Completed |
11 | SDRF 17-18 | Providing coated macadam and renewal BT at Keezha tharavilai sudalaimadan kovil road and cross road in w.no:22 | 7.80 | 7.80 | Completed |
12 | SDRF 17-18 | Supply and fixing of LED light in ngl Municipality | 50.00 | 50.00 | Completed |
13 | SDRF 17-18 | Providing coated macadam and renewal BT at Ganapathy nager in w.no:47 | 15.00 | 15.00 | Completed |
14 | MP 17-18 | Providing EB connection and Toilet room at sarakkalvilai vivekananthar salai padipagam in w.no:19 | 2.00 | 2.00 | Completed |
15 | MP 17-18 | Construction of Library building in Ramanputhoor MGR nager chettikulam in w.no:47 | 2.00 | 2.00 | Completed |
16 | MP 17-18 | Providing shed arrangment at veppamodu junction paonnappa nadar Taxi stand | 4.00 | 4.00 | Completed |
17 | MP 17-18 | Const. of Auditorium at Sakthi garden | 6.00 | 6.00 | Completed |
18 | MP 17-18 | Construction of Kalaiyarangam near Pallivilai Oochikadu Sudalai coil in w.no:3 | 13.00 | Completed | |
19 | MP 17-18 | Const. of community hall at mela tharavilai | 8.50 | 8.50 | Completed |
20 | MP 17-18 | Construction of Passengers waiting shed at vettoornimadam pallivilai | 2.00 | Cancellation letter send to Dist collector vide Lr.No: | |
21 | MLA 17-18 | Providing WMM and Bitumen Macadam BT surface in Bright street in w.no:26 | 6.00 | 5.99 | Completed |
22 | MLA 17-18 | Supply and fixing of 1no of solar light at gnanam colony pattel road (near water tank)at w.no:22 in nagercoil municipality | 0.50 | 0.49 | Completed |
23 | MLA 17-18 | Supply and fixing of 1no of solar light at gnanam colony E.O.C road (near water tank)at w.no:22 in nagercoil municipality | 0.50 | 0.49 | Completed |
24 | MLA 17-18 | Supply & fixing 2nos of solar light at Erubukadu Mutharammankovil front arch | 1.00 | 0.72 | Completed |
25 | MLA 17-18 | Providing shed at infront of auditorium in keelavannan vilai at w.no:20 | 5.00 | 5.00 | Completed |
26 | MLA 17-18 | Providing borewell at vallan kumaravilai near sudalai madanswamy kovil street in w.no:39 | 2.00 | 2.50 | Completed |
27 | MLA 17-18 | Providing borewell at Poovankudieruppu parthirakali ammankovil in w.no:22 | 2.75 | 2.45 | Completed |
28 | MLA 17-18 | Providing Paverblock at Paithumal nager in w.no:37 | 2.00 | 2.00 | Completed |
29 | MLA 17-18 | Providing paverblock at Ganapathy nager near petrol bunk in w.no:47 | 1.50 | 1.46 | Completed |
30 | MLA 17-18 | Providing galaxy borewell at Vallankumaravilai higher secondary school in w.no:38 | 2.50 | 1.86 | Completed |
31 | MLA 17-18 | Providing drainage & paverblock at Puthankudieruppu aiysha avenue in w.no:19 | 6.00 | 4.42 | Completed |
32 | MLA 17-18 | Providing galaxy borewell at vadalivilai sannathi stret in w.no:37 | 2.50 | 2.25 | Completed |
33 | MLA 17-18 | Providing BT surface at Mutharamman kovil in w.no:22 | 6.00 | 5.63 | Completed |
34 | MLA 17-18 | Providing galaxy borewell at keelavannanvilai Kamarajar street in w.no:20 | 2.50 | 2.13 | Completed |
35 | MLA 17-18 | Providing galaxy borewell at vannanvilai in w.no:20 | 2.50 | 1.81 | Completed |
36 | MLA 17-18 | Providing Galaxy borewell at NGO colony Kamarajar street in w.no:20 | 2.50 | 1.89 | Completed |
37 | MLA 17-18 | Providing galaxy borewell at Kurusady Punitha Anthoniyar school at w.no:41 | 2.50 | 1.93 | Completed |
38 | MLA 17-18 | Providing 30000litre OHT tank and borewell at SLB school in w.no:46 | 7.00 | 7.00 | Completed |
39 | MLA 17-18 | Construction of Community hall at Karthikivadali Mutharammanthiru kovil in w.no:22 | 10.00 | 10.00 | Completed |
40 | MLA 17-18 | Providing drainage and CC pavement at Kolappakonar theru in w.no:25 | 1.50 | 0.39 | Completed |
41 | MLA 17-18 | Supply and fixing of new steel grill over the manhole in jothi street (10nos)in w.no:26 | 1.00 | 0.78 | Completed |
42 | MLA 17-18 | Providing Mini power pump at Esaganvilai | 4.00 | 4.00 | Completed |
43 | MLA 17-18 | Providing paverblcok at Melasoorankudi near Arulmigu sri shathi vinayagar kovil near Bridge in w.no:22 | 3.00 | 3.00 | Completed |
44 | MLA 17-18 | Providing galaxy borewell at Melasooraikudi government higher secondary school at w.no:41 | 2.50 | 2.50 | Completed |
45 | MLA 17-18 | Supply and fixing of 2nos of solar light at Bharathi nagar colony park in w.no:49 | 1.00 | 0.99 | Completed |
46 | MLA 17-18 | Providing electrification and grill gate at Thammathukonam (22nd ward) Kamarajar nagar Kalaiyarangam | 0.30 | Completed | |
47 | MLA 17-18 | Construction of community hall at Krishancoil Vaithiyarvilai near arulmigu vathai swamy thirukovil compus in w.no:5 | 10.00 | Completed |