DHARMAPURI MUNICIPALITY தர்மபுரி நகராட்சி Scheme Monitoring Status Report |
|||||||||||||||
Printed Date :18-Jul-2022 12:30:23 PM | |||||||||||||||
S.No | Project ID | Name of Work | AS Details | TS Details | Work Order Date | Agreement Date | Agreement Period | Agreement Value | Physical Progress in % | Stage of the Work | |||||
AS Number | AS Date | AS Amount | TS Number | TS Date | TS Amount | ||||||||||
Region Status | |||||||||||||||
Name of the Region : SALEM | |||||||||||||||
Name of the Scheme : 15th CFC | |||||||||||||||
Name of the Muncipality : DHARMAPURI | |||||||||||||||
1 | 15th CFC/2020-21/037/WSIS/00005 | SUPPLY, DELIVERY AND LAYING Of 355 MM HDPE HOSE PIPE ( PN10 ) FROM PANCHAPALLI HEAD WORKS TO FIRST BACK PRESSURE TANK ( NEAR POLICE STATION ). | 174 | 17/Nov/2021 | 24760000 | 13 – 2 | 19/Nov/2021 | 2000000 | 10/Dec/2021 | 10/Dec/2021 | 90 Days | 1923116 | 20 | PIPES RECEIVED | |
2 | 15th CFC/2020-21/037/WSIS/00006 | SUPPLY, DELIVERY AND LAYING OF 355 MM HDPE HOSE PIPE ( PN10 ) FROM EXISTING AND NEW INFILTRATION WELL TO COLLECTION WELL WITH ERECTION OF NEW 15.0 H.O SUBMERSIBLE MOTOR WITH PUMP AT PANCHAPALLI HEAD WORKS. | 174 | 17/Nov/2021 | 24760000 | 14 – 3 | 19/Nov/2021 | 2350000 | 10/Dec/2021 | 10/Dec/2021 | 60 Days | 2172018 | 25 | PIPE RECEIVED. EARTH WORK IN PROGRESS | |
3 | 15th CFC/2020-21/037/WSIS/00007 | CONSTRUCTION OF 3.5 M DIAMETER INFILTRATION WELL AT CHINNAR RIVER DOWN STREAM SIDE AT PANCHAPALLI HEAD WORKS. | 174 | 17/Nov/2021 | 24760000 | 15 – 4 | 19/Nov/2021 | 2450000 | 10/Dec/2021 | 10/Dec/2021 | 90 Days | 2370312 | 10 | SIDE WALL CONCRETE WORK IN PROGRESS | |
4 | 15th CFC/2020-21/037/WS/00008 | ATTENDING R.C.C.PUMPING MAIN LEAKAGE IN A SIZE OF 400 MM,450 MM AND 600 MM FROM PANCHAPALLI HEAD WORKS TO DHARMAPURI TOWN.( Poduthampaati, Alliyur, Chelliyampatti( Near burial ground), Kadakathur( Near I.T.I & Arokiya Annai School ) Pulikkarai, Palacode | 174 | 17/Nov/2021 | 24760000 | 16 – 5 | 19/Nov/2021 | 1860000 | 10/Dec/2021 | 10/Dec/2021 | 90 Days | 1848446 | 100 | WORK COMPLETED | |
5 | 15th CFC/2020-21/037/WSIS/00009 | CONSTRUCTION OF POWER PUMP ROOM WITH 200 AMPS PANEL BOARD AT CHINNAR RIVER DOWN STREAM SIDE ( NEAR SRILANGAN REFUGEES CAMP ) | 174 | 17/Nov/2021 | 24760000 | 17 – 6 | 19/Nov/2021 | 1800000 | 10/Dec/2021 | 10/Dec/2021 | 90 Days | 1761287 | 10 | BRICK WORK SUPER STRUCTURE WORK IN PROGRESS | |
6 | 15th CFC/2020-21/037/BUILDING/00010 | Repair and maintenance for community Toilets at Muthusamy street (Ward 01) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 25 – 14 | 19/Nov/2021 | 540000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 528606 | 100 | WORK COMPLETED | |
7 | 15th CFC/2020-21/037/BUILDING/00011 | Repair and maintenance for community Toilets at Pachiyamman Burial ground (Ward 30) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 42 – 31 | 19/Nov/2021 | 340000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 331582 | 100 | WORK COMPLETED | |
8 | 15th CFC/2020-21/037/BUILDING/00012 | Repair and maintenance for community Toilets at Thandupathai street (Ward 32) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 44 – 33 | 19/Nov/2021 | 530000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 521774 | 100 | WORK COMPLETED | |
9 | 15th CFC/2020-21/037/BUILDING/00013 | Repair and maintenance for community Toilets at Baba shahib south (Ward 06) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 30 – 19 | 19/Nov/2021 | 240000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 240000 | 100 | WORK COMPLETED | |
10 | 15th CFC/2020-21/037/SWM/00014 | Repair and maintenance of micro compost centre at pachiyamman burial ground in dharmapuri municipality | 174 | 17/Nov/2021 | 24760000 | 19 – 8 | 19/Nov/2021 | 450000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 434633 | 100 | Work Completed | |
11 | 15th CFC/2020-21/037/BUILDING/00015 | Repair and maintenance for community Toilets at kuppandi street (Ward 07) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 31-20 | 19/Nov/2021 | 470000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 240000 | 100 | work completed | |
12 | 15th CFC/2020-21/037/BUILDING/00016 | Repair and maintenance for community Toilets at Chathiram mel street (Ward 24) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 39 – 28 | 19/Nov/2021 | 350000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 337990 | 100 | WORK COMPLETED | |
13 | 15th CFC/2020-21/037/SWM/00017 | Repair and maintenance of micro compost centre at mathikonpalayam burial ground in dharmapuri municipality | 174 | 17/Nov/2021 | 24760000 | 31-20 | 19/Nov/2021 | 470000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 447494 | 100 | WORK COMPLETED | |
14 | 15th CFC/2020-21/037/SWM/00018 | Repair and maintenance of micro compost centre in sandaipettai in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 21 – 10 | 19/Nov/2021 | 440000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 427359 | 100 | WORK COMPLETED | |
15 | 15th CFC/2020-21/037/BUILDING/00019 | Repair and maintenance for community Toilets at Thoppu street (Ward 32) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 43 – 32 | 19/Nov/2021 | 340000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 327243 | 100 | work completed | |
16 | 15th CFC/2020-21/037/BUILDING/00020 | Repair and maintenance for community Toilets at Perumal kovil street (Ward 33) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 47 – 36 | 19/Nov/2021 | 360000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 348123 | 100 | WORK COMPLETED | |
17 | 15th CFC/2020-21/037/BUILDING/00021 | Repair and maintenance for community Toilets at Chellan street (Ward 33) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 46 – 35 | 19/Nov/2021 | 210000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 210000 | 100 | work completed | |
18 | 15th CFC/2020-21/037/BUILDING/00022 | Repair and maintenance for community Toilets at Sandaipettai market (Ward 04) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 29 – 18 | 19/Nov/2021 | 280000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 270674 | 100 | WORK COMPLETED | |
19 | 15th CFC/2020-21/037/BUILDING/00023 | Repair and maintenance for community Toilets at Harichandra burial ground (Ward 10) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 34 – 23 | 19/Nov/2021 | 410000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 404049 | 100 | WORK COMPLETED | |
20 | 15th CFC/2020-21/037/BUILDING/00024 | Repair and maintenance for community Toilets at Kamatchiyamman street (Ward 03) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 28 – 17 | 19/Nov/2021 | 370000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 357411 | 100 | WORK COMPLETED | |
21 | 15th CFC/2020-21/037/BUILDING/00025 | Repair and maintenance for community Toilets at Agrahara street (Ward 20) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 37 – 26 | 19/Nov/2021 | 450000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 439901 | 100 | WORK COMPLETED | |
22 | 15th CFC/2020-21/037/BUILDING/00026 | Repair and maintenance for community Toilets at Gollahalli road (Ward 26) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 40 – 29 | 19/Nov/2021 | 350000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 338745.57 | 100 | WORK COMPLETED | |
23 | 15th CFC/2020-21/037/BUILDING/00027 | Repair and maintenance for community Toilets at Mittarettihalli (Ward 26) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 41 – 30 | 19/Nov/2021 | 320000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 310459 | 100 | WORK COMPLETED | |
24 | 15th CFC/2020-21/037/BUILDING/00028 | Repair and maintenance for community Toilets at Mathiconpalayam burial ground (Ward 02) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 27 – 16 | 19/Nov/2021 | 360000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 343406 | 100 | Work Completed | |
25 | 15th CFC/2020-21/037/BUILDING/00029 | Repair and maintenance for community Toilets at Ratnam street (Ward 02) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 26 – 15 | 19/Nov/2021 | 390000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 374920 | 100 | WORK COMPLETED | |
26 | 15th CFC/2020-21/037/BUILDING/00030 | Repair and maintenance for community Toilets at Golden street (Ward 08) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 33 – 22 | 19/Nov/2021 | 390000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 378356 | 0 | WORK COMPLETED | |
27 | 15th CFC/2020-21/037/SWM/00031 | supply and delivery ,fixing of Napkin incinerator (2500 watt) at Micro compost centre Harichandran burial ground ,pachiyamman burial ground,sandaipettai with mathikonpalayam micro compost centre in dharmapuri municipality | 174 | 17/Nov/2021 | 24760000 | 24 – 13 | 19/Nov/2021 | 600000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 588848 | 100 | WORK COMPLETED | |
28 | 15th CFC/2020-21/037/BUILDING/00032 | Repair and maintenance for community Toilets at Mel thoppu street (Ward 15) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 35 – 24 | 19/Nov/2021 | 360000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 353024 | 100 | WORK COMPLETED | |
29 | 15th CFC/2020-21/037/BUILDING/00033 | Repair and maintenance for community Toilets at Annasagaram Erikarai (Ward 33) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 45 – 34 | 19/Nov/2021 | 390000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 378857 | 100 | WORK COMPLETED | |
30 | 15th CFC/2020-21/037/ROAD/00038 | IMPROVEMENT OF EXISTING BITUMEN SURFACE AT MOFUSSIL BUS STAND (EAST SIDE) IN DHARMAPURI MUNICIPALITY | 174-21191/2021/AMRUT-2 | 17/Nov/2021 | 3900000 | 72/2021-22 (6382/2021/B1) | 29/Dec/2021 | 3900000 | 25/Jan/2022 | 25/Jan/2022 | 15 Days | 3900000 | 100 | work completed | |
31 | 15th CFC/2020-21/037/WS/00039 | Providing and laying of 110mm distribution line from pidamaneri main road to south railway line road (WARD 12) in Dharmapuri municipality | 174 | 17/Nov/2021 | 24760000 | 18 – 7 | 19/Nov/2021 | 1200000 | 10/Dec/2021 | 10/Dec/2021 | 90 Days | 1200000 | 100 | WORK COMPLETED | |
32 | 15th CFC/2020-21/037/WSIS/00040 | SUPPLY, DELIVERY AND ERECTION OF 7.50 HP SUBMERSIBLE MOTOR WITH THREE PHASE PANEL BOARD IN THE EXISTING 150MM DIA. BOREWELL AND OPEN WELL WITH STAR DELTA PANEL BOARD AT PANCHAPALLI HEAD WORKS AND DAM SITE. | 174 | 17/Nov/2021 | 24760000 | 12 – 1 | 19/Nov/2021 | 2000000 | 10/Dec/2021 | 10/Dec/2021 | 90 Days | 1715470 | 100 | WORK COMPLETED | |
33 | 15th CFC/2020-21/037/SWM/00041 | Repair and maintenance of micro compost centre harichandra burial ground at dharmapuri municipality | 174 | 17/Nov/2021 | 24760000 | 22 – 11 | 19/Nov/2021 | 460000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 403113 | 100 | WORK COMPLETED | |
34 | 15th CFC/2020-21/037/SWM/00042 | Repair and maintenance work for battery oprated vehicle 5 Nos at Dharmapuri municipality | 174 | 17/Nov/2021 | 24760000 | 23 – 12 | 19/Nov/2021 | 600000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 507900 | 100 | WORK COMPLETED | |
35 | 15th CFC/2020-21/037/BUILDING/00043 | Repair and maintenance for community toilet at poomalai street (ward 22) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 38 – 27 | 19/Nov/2021 | 220000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 220000 | 100 | Work completed | |
36 | 15th CFC/2020-21/037/BUILDING/00045 | Repair and maintenance for community toilet at vadakarayan street (ward 7) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 32 – 21 | 19/Nov/2021 | 320000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 272688 | 100 | Work completed | |
37 | 15th CFC/2020-21/037/ROAD/00047 | IMPROVEMENTS OF EXISTING BITUMEN SURFACE AT MOFUSIL BUS STAND (WEST SIDE) IN DHARMAPURI MUNICIPALITY | 174/21191/2021 AMRUT -2 | 17/Nov/2021 | 3900000 | 73/2021-22(6382/ 2021 B1 | 29/Dec/2021 | 3900000 | 25/Jan/2022 | 25/Jan/2022 | 15 Days | 3900000 | 100 | WORK COMPLETED | |
38 | 15th CFC/2021-22/037/ROAD/00049 | Relaying of Road– , | 31114 / 2021/AMRUT3 | 05/Jan/2022 | 4930000 | 80 | 17/Mar/2022 | 4930000 | 0 | 0 | 0 | ||||
39 | 15th CFC/2020-21/037/BUILDING/00056 | Repair and MAintenance for Community Toilets at Narasaiyarkulam (Ward 17) in Dharmapuri Municipality | 174 | 17/Nov/2021 | 24760000 | 36 – 25 | 19/Nov/2021 | 320000 | 05/Jan/2022 | 05/Jan/2022 | 30 Days | 320000 | 100 | WORK COMPLETED | |
40 | 15th CFC/2021-22/037/BUILDING/00057 | UPHC Dharmapuri- Building- 1 No. | 32454/2021/AMRUT-2/Dharmapuri | 17/Dec/2021 | 2500000 | 54 | 21/Dec/2021 | 2500000 | 25/Feb/2022 | 25/Feb/2022 | 6 Months | 2500000 | 50 | ROOF CONCRETE LAID OUTER PLASTIC WORK IN PROGRESS | |
41 | 15th CFC/2021-22/037/BUILDING/00108 | Construction of Compound Wall and Painting at Annasagaram Burial Ground | 306 | 28/Feb/2022 | 1200000 | 62 | 02/Mar/2022 | 1200000 | 23/May/2022 | 23/May/2022 | 60 Days | 1200000 | 15 | COLUMN CONCRETE WORK IN PROGRESS | |
42 | 15th CFC/2021-22/037/BUILDING/00109 | Construction of Compound Wall and Painting at Harichandran Burial Ground -Ward No.10 | 307 | 28/Feb/2022 | 2000000 | 63 | 02/Mar/2022 | 2000000 | 23/May/2022 | 23/May/2022 | 60 Days | 2000000 | 15 | COLUMN CONCRETE WORK IN PROGRESS | |
Name of the Scheme : CGF | |||||||||||||||
Name of the Muncipality : DHARMAPURI | |||||||||||||||
43 | CGF/2021-22/037/ROAD/00061 | Relaying of Road-037/2021/001/L/0000247-MUTHUSAMY STREET , | 19089/2021/E2 Annexe 10 – Dharmapuri – 1 | 25/Mar/2022 | 328000 | 1 | 04/Apr/2022 | 328000 | 30/May/2022 | 30/May/2022 | 30 Days | 328000 | 100 | WORK COMPLETED | |
44 | CGF/2021-22/037/ROAD/00062 | Relaying of Road-037/2021/018/R/0000140-RAJAGOPAL STREET , | 19089/2020/E2 Annexe – 10 – Dharmapuri – 3 | 25/Mar/2022 | 691000 | 3 | 04/Apr/2022 | 691000 | 30/May/2022 | 30/May/2022 | 30 Days | 691000 | 20 | DRAINAGE WALL CONCRETE WORK IN PROGRESS | |
45 | CGF/2021-22/037/SWD/00064 | Construction of Storm water drain Gowse street | 19089/2021/E2 Annexe 10 – Dharmapuri – 10 | 25/Mar/2022 | 220000 | 9 | 04/Apr/2022 | 220000 | 30/May/2022 | 30/May/2022 | 30 Days | 220000 | 10 | DISMANTLING OF DRAIN CONCRETE WORKS | |
46 | CGF/2021-22/037/ROAD/00065 | Repair /Maintenance-037/2021/006/S/0000137-BABA STREET , | 19089/2021/E2 Annexe 10 – Dharmapuri – 15 | 25/Mar/2022 | 975000 | 15 | 04/Apr/2022 | 975000 | 30/May/2022 | 30/May/2022 | 30 Days | 975000 | 10 | DISMANTLING OF CEMENT CONCRET WORKS | |
47 | CGF/2021-22/037/SWD/00066 | Construction of Storm water drain at Mohamed Hussian street | 19089/2021/E2 Annexe 10 – Dharmapuri – 16 | 25/Mar/2022 | 390000 | 16 | 04/Apr/2022 | 390000 | 30/May/2022 | 30/May/2022 | 30 Days | 390000 | 10 | DISMANTLING OF DRAIN CONCRETE WORKS | |
48 | CGF/2021-22/037/ROAD/00067 | Repair /Maintenance-037/2021/014/R/0000251-MAYIL MANDAPA STREET , | 19089/2021/E2 Annexe 10 – Dharmapuri – 26 | 25/Mar/2022 | 498000 | 23 | 04/Apr/2022 | 498000 | 30/May/2022 | 30/May/2022 | 30 Days | 498000 | 10 | BT ROAD MILLING WORK IN PROGRESS | |
49 | CGF/2021-22/037/ROAD/00068 | Repair /Maintenance-037/2021/007/L/0000126-NARAYANAN VEEDHI , | 19089/2021/E2 Annexe 10 – Dharmapuri – 17 | 25/Mar/2022 | 274000 | 17 | 04/Apr/2022 | 274000 | 30/May/2022 | 30/May/2022 | 30 Days | 274000 | 100 | WORK COMPLETED | |
50 | CGF/2021-22/037/ROAD/00069 | Repair /Maintenance-037/2021/003/L/0000190-JADAYAN SANDHU , | 19089/2021/E2 Annexe 10 – Dharmapuri – 8 | 25/Mar/2022 | 95000 | 8 | 04/Apr/2022 | 95000 | 30/May/2022 | 30/May/2022 | 30 Days | 95000 | 100 | WORK COMPLETED | |
51 | CGF/2021-22/037/SWD/00070 | Construction of Storm water drain at Baba shahib 1st street 1 cross | 19089/2021/E2 Annexe 10 – Dharmapuri – 14 | 25/Mar/2022 | 134000 | 14 | 04/Apr/2022 | 134000 | 30/May/2022 | 30/May/2022 | 30 Days | 134000 | 0 | DISMANTLING OF DRAIN WORK IN PROGRESS | |
52 | CGF/2021-22/037/ROAD/00071 | Repair /Maintenance-037/2021/005/R/0000144-ISMAYIL ROAD , | 19089/2021/E2 Annexe 10 – Dharmapuri – 13 | 25/Mar/2022 | 1170000 | 13 | 04/Apr/2022 | 1170000 | 30/May/2022 | 30/May/2022 | 30 Days | 1170000 | 10 | BT ROAD MILLING WORK IN PROGRESS | |
53 | CGF/2021-22/037/ROAD/00072 | Repair /Maintenance-037/2021/005/S/0000147-AJATH ROAD , | 19089/2021/E2 Annexe 10 – Dharmapuri – 12 | 25/Mar/2022 | 218000 | 12 | 04/Apr/2022 | 218000 | 30/May/2022 | 30/May/2022 | 30 Days | 218000 | 10 | DISMANTLING OF CONCRETE ROADS | |
54 | CGF/2021-22/037/SWD/00073 | Construction of Storm water drain at Ibrahim road | 19089/2021/E2 Annexe 10 – Dharmapuri – 11 | 25/Mar/2022 | 996000 | 10 | 04/Apr/2022 | 996000 | 30/May/2022 | 30/May/2022 | 30 Days | 996000 | 10 | DISMANTLING OF DRAIN WORKS | |
55 | CGF/2021-22/037/ROAD/00074 | Repair /Maintenance-037/2021/003/R/0000175-VELLOLAYAN SANDHU VEEDHI , | 19089/2021/E2 Annexe 10 – Dharmapuri – 6 | 25/Mar/2022 | 467000 | 6 | 04/Apr/2022 | 467000 | 30/May/2022 | 30/May/2022 | 30 Days | 467000 | 100 | WORK COMPLETED | |
56 | CGF/2021-22/037/ROAD/00075 | Repair /Maintenance-037/2021/003/L/0000200-MUNUSAMY ROAD , | 19089/2021/E2 Annexe 10 – Dharmapuri – 7 | 25/Mar/2022 | 85000 | 7 | 04/Apr/2022 | 85000 | 30/May/2022 | 30/May/2022 | 30 Days | 85000 | 100 | WORK COMPLETED | |
57 | CGF/2021-22/037/ROAD/00076 | Repair /Maintenance-037/2021/002/S/0000205-BEEMAN STREET NO2 , | 19089/2021/E2 Annexe 10 – Dharmapuri – 4 | 25/Mar/2022 | 438000 | 4 | 04/Apr/2022 | 438000 | 30/May/2022 | 30/May/2022 | 30 Days | 438000 | 100 | WORK COMPLETED | |
58 | CGF/2021-22/037/ROAD/00077 | Repair /Maintenance-037/2021/007/L/0000123-KAVERI VEEDHI , | 19089/2021/E2 Annexe 10 – Dharmapuri – 18 | 25/Mar/2022 | 613000 | 18 | 04/Apr/2022 | 613000 | 30/May/2022 | 30/May/2022 | 30 Days | 613000 | 100 | WORK COMPLETED | |
59 | CGF/2021-22/037/ROAD/00078 | Repair /Maintenance-037/2021/010/S/000096-SANJEEVI SANDHU , | 19089/2021/E2 Annexe 10 – Dharmapuri – 19 | 25/Mar/2022 | 346000 | 19 | 04/Apr/2022 | 346000 | 30/May/2022 | 30/May/2022 | 30 Days | 346000 | 100 | WORK COMPLETED | |
60 | CGF/2021-22/037/ROAD/00079 | Repair /Maintenance-037/2021/019/R/0000268-MASUTHI KEEL STREET , | 19089/2021/E2 Annexe 10 – Dharmapuri – 27 | 25/Mar/2022 | 1249000 | 24 | 04/Apr/2022 | 1249000 | 30/May/2022 | 30/May/2022 | 30 Days | 1249000 | 15 | DRAIN PCC 1:4:8 WORK IS IN PROGRESS | |
61 | CGF/2021-22/037/ROAD/00080 | Repair /Maintenance-037/2021/010/R/000093-HARICHANDRAN KOVIL STREET , | 19089/2021/E2 Annexe 10 – Dharmapuri – 20 | 25/Mar/2022 | 5960000 | ||||||||||
62 | CGF/2021-22/037/ROAD/00081 | Repair /Maintenance-037/2021/019/L/0000267-ANNA STREET , | 19089/2021/E2 Annexe 10 – Dharmapuri – 28 | 25/Mar/2022 | 413000 | 25 | 04/Apr/2022 | 413000 | 30/May/2022 | 30/May/2022 | 30 Days | 413000 | 100 | WORK COMPLETED | |
63 | CGF/2021-22/037/ROAD/00082 | Repair /Maintenance-037/2021/011/R/000092-ULAVAR STREET , | 19089/2021/E2 Annexe 10 – Dharmapuri – 21 | 25/Mar/2022 | 3234000 | ||||||||||
64 | CGF/2021-22/037/ROAD/00083 | Repair /Maintenance-037/2021/019/L/0000122-HOSURAN STREET , | 19089/2021/E2 Annexe 10 – Dharmapuri – 29 | 25/Mar/2022 | 83000 | 26 | 04/Apr/2022 | 83000 | 30/May/2022 | 30/May/2022 | 30 Days | 83000 | 100 | WORK COMPLETED | |
65 | CGF/2021-22/037/ROAD/00084 | Repair /Maintenance-037/2021/012/R/000088-PEDAMANERI ROAD , | 19089/2021/E2 Annexe 10 – Dharmapuri – 22 | 25/Mar/2022 | 2552000 | ||||||||||
66 | CGF/2021-22/037/WSIS/00085 | Providing and laying of water supply Main distribution line at Narathan veethi | 19089/2021/E2 Annexe 10 – Dharmapuri – 30 | 25/Mar/2022 | 30000 | 27 | 04/Apr/2022 | 30000 | 30/May/2022 | 30/May/2022 | 30 Days | 30000 | 10 | EARTH WORK IN PROGRESS | |
67 | CGF/2021-22/037/ROAD/00086 | Repair /Maintenance-037/2021/013/R/0000259-Anna Nagar 1st Cross , | 19089/2021/E2 Annexe 10 – Dharmapuri – 23 | 25/Mar/2022 | 2226000 | 20 | 04/Apr/2022 | 2226000 | 30/May/2022 | 30/May/2022 | 30 Days | 2226000 | 10 | BT ROAD MILLING WORK IN PROGRESS | |
68 | CGF/2021-22/037/ROAD/00087 | Repair /Maintenance-037/2021/020/L/0000291-PERUMAL KOVIL VEEDHI , | 19089/2021/E2 Annexe 10 – Dharmapuri – 31 | 25/Mar/2022 | 800000 | 28 | 04/Apr/2022 | 800000 | 30/May/2022 | 30/May/2022 | 30 Days | 800000 | 10 | DISMANTLING OF CONCRETE ROAD WORKS | |
69 | CGF/2021-22/037/ROAD/00088 | Relaying of Road-037/2021/014/R/0000253-MARIYAMAN KOIL STREET , | 19089/2021/E2 Annexe 10 – Dharmapuri -24 | 25/Mar/2022 | 1564000 | 21 | 04/Apr/2022 | 1564000 | 30/May/2022 | 30/May/2022 | 30 Days | 1564000 | 10 | WET MIX LAYING WORK IS IN PROGRESS | |
70 | CGF/2021-22/037/ROAD/00089 | Repair /Maintenance-037/2021/020/L/0000281-KALI VATHIYAR VEEDHI , | 19089/2021/E2 Annexe 10 – Dharmapuri – 32 | 25/Mar/2022 | 409000 | 29 | 04/Apr/2022 | 409000 | 30/May/2022 | 30/May/2022 | 30 Days | 409000 | 100 | WORK COMPLETED | |
71 | CGF/2021-22/037/ROAD/00090 | Repair /Maintenance-037/2021/014/R/0000254-PILLAYAR KOVIL STREET , | 19089/2021/E2 Annexe 10 – Dharmapuri – 25 | 25/Mar/2022 | 1796000 | 22 | 04/Apr/2022 | 1796000 | 30/May/2022 | 30/May/2022 | 30 Days | 1796000 | 25 | DRAIN WORK COMPLETED.BT ROAD MILING WORK IS IN PROGRESS | |
72 | CGF/2021-22/037/ROAD/00091 | Repair /Maintenance-037/2021/024/S/000057-ANNAMALAI STREET , | 19089/2021/E2 Annexe 10 – Dharmapuri – 33 | 25/Mar/2022 | 1404000 | 30 | 04/Apr/2022 | 1404000 | 30/May/2022 | 30/May/2022 | 30 Days | 1404000 | 25 | BT ROAD MILLING WORK IN PROGRESS | |
73 | CGF/2021-22/037/ROAD/00092 | Repair /Maintenance-037/2021/025/S/0000314-Sathiram Mel Street , | 19089/2021/E2 Annexe 10 – Dharmapuri – 34 | 25/Mar/2022 | 1253000 | 31 | 04/Apr/2022 | 1253000 | 30/May/2022 | 30/May/2022 | 30 Days | 1253000 | 10 | DISMANTLING OF CONCRETE ROAD WORKS | |
74 | CGF/2021-22/037/ROAD/00093 | Repair /Maintenance-037/2021/026/S/0000468-Vediyappan Thittu Main Road Cross 1 , 037/2021/026/L/0000475-Vediyappan Thittu Cross 1 Street 3 , | 19089/2021/E2 Annexe 10 – Dharmapuri – 35 | 25/Mar/2022 | 1913000 | 32 | 04/Apr/2022 | 1913000 | 30/May/2022 | 30/May/2022 | 30 Days | 1913000 | 25 | DRAIN WORK COMPLETED. DISMANTLING OF CONCRETE ROAD WORKS | |
75 | CGF/2021-22/037/ROAD/00094 | Relaying of Road-037/2021/027/S/000039-NATTANAMAIPURAM(GANDHI NAGAR 4 CR) , | 19089/2021/E2 Annexe 10 – Dharmapuri – 36 | 25/Mar/2022 | 1448000 | 33 | 04/Apr/2022 | 1448000 | 30/May/2022 | 30/May/2022 | 30 Days | 1448000 | 25 | DRAIN WORK COMPLETED. DISMANTLING OF CONCRETE ROAD WORKS | |
76 | CGF/2021-22/037/ROAD/00095 | Relaying of Road-037/2021/029/R/0000413-Nedumaran Nagar Cross 1 , | 19089/2021/E2 Annexe 10 – Dharmapuri – 37 | 25/Mar/2022 | 2851000 | ||||||||||
77 | CGF/2021-22/037/WSIS/00096 | Providing and laying of water supply Main distribution line at Kumarapuri colony 1st,2nd,3rd&4th cross streets | 19089/2021/E2 Annexe 10 – Dharmapuri – 38 | 25/Mar/2022 | 552000 | 34 | 04/Apr/2022 | 552000 | 30/May/2022 | 30/May/2022 | 30 Days | 552000 | 100 | WORK COMPLETED | |
78 | CGF/2021-22/037/ROAD/00097 | Repair /Maintenance-037/2021/031/R/0000362-Kumarapuri Colony Main Road Cross 1 , 037/2021/031/R/0000363-Kumarapuri Colony Main Road Cross 2 , | 19089/2021/E2 Annexe 10 – Dharmapuri – 39 | 25/Mar/2022 | 1647000 | 35 | 04/Apr/2022 | 1647000 | 30/May/2022 | 30/May/2022 | 30 Days | 1647000 | 10 | BT ROAD MILLING WORKS | |
79 | CGF/2021-22/037/ROAD/00098 | Repair /Maintenance-037/2021/003/L/0000191-CHINNU MASTRY SANDHU , | 19089/2021/E2 Annexe 10 – Dharmapuri – 5 | 25/Mar/2022 | 43000 | 5 | 04/Apr/2022 | 43000 | 30/May/2022 | 30/May/2022 | 30 Days | 43000 | 100 | WORK COMPLETED | |
80 | CGF/2021-22/037/SWD/00099 | Relaying of existing damaged drain at Periyapaiyan Street | 19089/2021/E2 Annexe 10 – Dharmapuri – 2 | 25/Mar/2022 | 50000 | 2 | 04/Apr/2022 | 50000 | 30/May/2022 | 30/May/2022 | 30 Days | 50000 | 10 | DESILTING OF DRAIN WORKS IN PROGRESS | |
81 | CGF/2021-22/037/ROAD/00100 | Repair /Maintenance-037/2021/005/S/0000149-RAGAVAN ROAD , | 19089/2021/E2 Annexe 10 Dharmapuri – 9 | 25/Mar/2022 | 240000 | 11 | 04/Apr/2022 | 240000 | 30/May/2022 | 30/May/2022 | 30 Days | 240000 | 100 | WORK COMPLETED | |
Name of the Scheme : Kalaignar Nagarpura Mempatu Thittam | |||||||||||||||
Name of the Muncipality : DHARMAPURI | |||||||||||||||
82 | Kalaignar /2021-22/037/ROAD/00001 | Providing BT Surface at Annasagaram thandupathai cross street 1 W.No.32 037032R237 Annasagaram thandupathai cross street 2 W.No.32 037032R238 Annasagaram thandupathai cross street 3 W.No.32 037032R239 Annasagaram thandupathai cross street 4 W.No.32 037032R240 Annasagaram thandupathai cross street 7 W.No.32 037032R244 |
G.O. (Ms) No. 92-MAWS-NS- Dharampuri -Block Topping Road | 30/Oct/2021 | 4200000 | 112/2021-2022 | 19/Nov/2021 | 4200000 | 13/Dec/2021 | 13/Dec/2021 | 6 Months | 4406640 | 100 | WORK COMPLETED | |
83 | Kalaignar /2021-22/037/SWD/00002 | Construction of SWD at Annasagaram thandupathai cross street 1 W.No.32037032R237 Annasagaram thandupathai cross street 2 W.No.32037032R238 Annasagaram thandupathai cross street 3 W.No.32037032R239 Annasagaram thandupathai cross street 4 W.No.32037032R240 Annasagaram thandupathai cross street 7 W.No.32037032R244 |
G.O. (Ms) No. 92-MAWS-NS-Dharamapuri -Storm Water Drain | 30/Oct/2021 | 4400000 | 112/2021-2022 – 1 | 19/Nov/2021 | 4400000 | 13/Dec/2021 | 13/Dec/2021 | 6 Months | 4400000 | 100 | WORK COMPLETED | |
84 | Kalaignar /2021-22/037/BUILDING/00001 | Construction of Knowledge and Study Centre (Type-III) at Sandalpettai Ward No.4 in Dharmapurai Municipality | G.O.(Ms.)No.92 MAWS – Dharmapuri – Knowledge Centre | 30/Oct/2021 | 25000000 | 538/2021-22 | 25000000 | 02/Mar/2022 | 02/Mar/2022 | 6 Months | 26245000 | 17 | Upto LIINTEL Level Column & Brick Work is in Progress | ||
85 | Kalaignar /2021-22/037/ROAD/00002 | Providing BT Roads at DNV Nagar main road W.No.10 037010R60 DNV Nagar 1 st cross 037010R61 DNV Nagar 2nd cross W.No.10 037010R62 DNV Nagar 3rd cross W.No.10 037010R63 DNV Nagar 4th cross W.No.10 037010R64 DNV Nagar 5th cross W.No.10 037010R65 DNV Nagar 6th cross W.No.10 037010R66 DNV Nagar 8th cross v 037010R68 DNV Nagar 10th cross W.No.10 037010R70 |
G.O.(Ms.)No.92 MAWS – Dharmapuri – BT Roads | 30/Oct/2021 | 8590000 | 111/2021-2022 | 8590000 | 13/Dec/2021 | 13/Dec/2021 | 6 Months | 8590000 | 100 | WORK COMPLETED | ||
86 | Kalaignar /2021-22/037/SWD/00003 | Construction of SWD at DNV Nagar main road W.No.10037010R60 DNV Nagar 1 st cross037010R61 DNV Nagar 3rd cross W.No.10037010R63 DNV Nagar 4th cross W.No.10037010R64 DNV Nagar 5th cross W.No.10037010R65 DNV Nagar 6th cross W.No.10037010R66 DNV Nagar 10th cross W.No.10037010R70 |
G.O. (Ms) No. 92-MAWS-NS- Dharmapuri – SWD | 30/Oct/2021 | 3400000 | 111/2021-2022 | 3400000 | 13/Dec/2021 | 13/Dec/2021 | 6 Months | 3400000 | 100 | WORK COMPLETED | ||
87 | Kalaignar /2021-22/037/CULVERT/00046 | Construction of Culvert at DNV Nagar main road W.No.10037010R60 DNV Nagar 1 st cross037010R61 DNV Nagar 2nd cross W.No.10037010R62 DNV Nagar 3rd cross W.No.10037010R63 DNV Nagar 4th cross W.No.10037010R64 DNV Nagar 5th cross W.No.10037010R65 DNV Nagar 6th cross W.No.10037010R66 DNV Nagar 8th cross v037010R68 DNV Nagar 10th cross W.No.10037010R70 |
G.O.(Ms) No.92 MAWS Annexe I(5) Culvert – Dharmapuri | 30/Oct/2021 | 670000 | 111/2021-2022 | 670000 | 13/Dec/2021 | 13/Dec/2021 | 6 Months | 670000 | 100 | WORK COMPLETED | ||
88 | Kalaignar /2021-22/037/WS/00058 | Rejuvenation of Water Bodies – Kunnankulam (ward.No.26) survey no.19 Block No.11,Ward:D in Dharmapuri Municipality | G.O.(Ms) No.73 MAWS Annexe I-B(1) Water Bodies | 13/May/2022 | 2200000 | 40 | 25/May/2022 | 2200000 | 08/Jun/2022 | 08/Jun/2022 | 60 Days | 2200000 | 25 | Silt Cleaning Work in Progress | |
89 | Kalaignar /2021-22/037/PARK/00059 | Improvement of ASTC colony 1 (ward.No.10) Survey.No.327,328. Block.No.18 ward.No.C) in Dharmapuri Municipality | G.O.(Ms) No.73 MAWS Annexe I-B(2) Park | 13/May/2022 | 7525000 | 161/2022-23 | 25/May/2022 | 7525000 | 28/Jun/2022 | 28/Jun/2022 | 6 Months | 7525000 | 5 | Compound Wall Footing Concrete work | |
90 | Kalaignar /2022-23/037/BUILDING/00113 | Construction of Modern LPG Crematorium at Harichandran Burial Ground in Ward No.10, Block No. 5, SF No.10 | G.O. (Ms) No.88 Annexure-I(3) CREMATORIUM (NEW) | 17/Jun/2022 | 14246000 | ||||||||||
Name of the Scheme : Namakku Naame Thittam | |||||||||||||||
Name of the Muncipality : DHARMAPURI | |||||||||||||||
91 | Namakku Na/2021-22/037/SWD/00101 | Construction of strom water drain, cover slab with culvert senkodipuram survey number 12/1B (ward no. 17 & 18) | 27519-36/2021/P2-Annexe I Dharmapuri | 30/Mar/2022 | 3250000 | 64 | 08/Mar/2022 | 3250000 | 10/May/2022 | 10/May/2022 | 30 Days | 3250000 | 100 | WORK COMPLETED | |
92 | Namakku Na/2021-22/037/SL/00102 | Supply and fixing of 12M High Mast Light 150 watts with 6 Lights in Barathipuram ward – 31 | 27519-36/2021/P2 Annexe II Dharmapuri – 4 | 30/Mar/2022 | 400000 | 68 | 08/Mar/2022 | 400000 | 10/May/2022 | 10/May/2022 | 30 Days | 400000 | 100 | WORK COMPLETED | |
93 | Namakku Na/2021-22/037/BUILDING/00103 | Repair and maintenance of Gasifier Crematorium at Pachiyamman Burial Ground | 27519-36/2021/P2 Annexe II Dharmapuri – 3 | 31/Mar/2022 | 2000000 | 67 | 08/Mar/2022 | 2000000 | 10/May/2022 | 10/May/2022 | 30 Days | 2000000 | 100 | WORK COMPLETED | |
94 | Namakku Na/2021-22/037/BUILDING/00104 | Renovation of moffusil Bus stand toilets | 27519-36/2021/P2 Annexe II Dharmapuri – 2 | 31/Mar/2022 | 1000000 | 66 | 08/Mar/2022 | 1000000 | 10/May/2022 | 10/May/2022 | 30 Days | 1000000 | 100 | WORK COMPLETED | |
95 | Namakku Na/2021-22/037/BUILDING/00105 | Renovation of Town Bus Stand toilets | 27519-36/2021/P2 Annexe II Dharmapuri – 1 | 31/Mar/2022 | 1000000 | 65 | 08/Mar/2022 | 1000000 | 10/May/2022 | 10/May/2022 | 30 Days | 1000000 | 100 | WORK COMPLETED | |
96 | Namakku Na/2021-22/037/SL/00106 | Supply and fixing of 12M High Mast Light 150 watts with 6 Lights in Mathikonpalaam opposite by Burial Ground | 27519-36/2021/P2 Annexe II Dharmapuri – 6 | 30/Mar/2022 | 400000 | 70 | 08/Mar/2022 | 400000 | 10/May/2022 | 10/May/2022 | 30 Days | 400000 | 100 | WORK COMPLETED | |
97 | Namakku Na/2021-22/037/SL/00107 | Supply and fixing of 12M High Mast Light 150 watts with 6 Lights in Uzhavar street | 27519-36/2021/P2 Annexe II Dharmapuri – 5 | 30/Mar/2022 | 400000 | 69 | 08/Mar/2022 | 400000 | 10/May/2022 | 10/May/2022 | 30 Days | 400000 | 100 | WORK COMPLETED | |
Name of the Scheme : National Urban Health Mission | |||||||||||||||
Name of the Muncipality : DHARMAPURI | |||||||||||||||
98 | National U/2021-22/037/BUILDING/00048 | Construction of additional building at Urban health centre building IN WARD – B, BLOCK – 19, T.S.No.4 AT SANDAIPETTAI PREMISSES IN DHARMAPURI MUNICIPALITY. (1st Floor) | 3467/ 2019 e1 | 06/Dec/2021 | 4000000 | 57 | 06/Dec/2021 | 4000000 | 24/Feb/2022 | 24/Feb/2022 | 6 Months | 4000000 | 75 | Roof Concrete Work Complete |