Authorisation for Operation of Waste Processing facility under SWM Rules-2016 valid upto 31.03.2020
A.General Particulars:-
| Present Population | No. of Assessment | Total Road Length in KM | Revenue in Lakhs | Expenditure on pay in Lakhs | % of Expenditure on pay & pension | Garbage generation in MT |
| 51865
|
14793 | 116.790 | 886.31 | 456.71 | 51% | 14.50 |
B.Waste characterization:-
| Date of Test | Organic/Biodegradable (%) | Glass metals Rubber Leather (%) | Paper (%) | Plastic (%) | Energy Content (KJ/Kg) | |
| Organic waste | Non organic waste | |||||
| 05.10.16
|
70 | 15 | 5 | 10 | 8.70 MT | 5.80 MT |
C.Primary Collection:-
| Type of Vehicle | No of Assessment | Required | Available | No. of Trips per day | Quantity collected per day | Shortfall | Action taken to overcome shortfall |
| Pushcart | 7760 | 41 | 41 | 2 trips | 2.90 MT | Nil | — |
| Tricycle | 7033 | 24 | 24 | 2 trips | 2.80 MT | Nil | — |
D.Secondary Collection & Transportation:-
| Type of Vehicle | No of
Assessment |
Required | Available | Capacity in MT | No. of Trips per day | Quantity collected per day | Shortfall | Action taken to overcome shortfall |
|
Mini Auto |
1793 |
2 |
2 |
0.5 |
2 |
3.00 MT |
— |
— |
| Tipper Lorry |
4500 |
2 |
2 |
1.5 |
2 |
3.00 MT |
— |
— |
| Dumper placer |
8500 |
2 |
2 |
1.4 |
2 |
2.80 MT |
— |
— |
| Compactor | — | — | — | — | — | — | — | — |
| Refuse Collector | — | — | — | — | — | — | — | — |
E.Compost Yard:-
| Required extent as per norms | Available extent | Location (mention the distance from crore town) | Survey no | Adequate or not | If Inadequate action taken | Land issue of any (attach separate sheet if necessary) |
| 5.00 Acres | 4.58 acres | 15 kms | Ward no.17 Block no.11 Karaikudi | Adequate | — |
F.Disposal:-
| Windrow system of composting | Vermi composting | Vermi casting | Bio gas | Bio gas power plant | Landfill | Dumping | RDF |
| — | — | — | — | — | — | — | — |
G.Sanitary workers Detail:-
| Name of post | Sanctioned post | As per norms (GO.No.101 dt.30.04.97) | Presently Available | Shortfall between available strength & norms | Shortfall between sanctioned strength & norms | Outsourcing privatization if any (Status) |
| Sanitary Workers | 95 | 205 | 60 | 145 | 115 |
Yes (115 Nos) |
| Sanitary Inspector | 3 | 3 | 2 | 1 | 1 | — |
| Sanitary Officer | — | — | — | — | — | — |
| Driver
|
2 | 2 | 2 | — | — | — |
H.Sanitary Workers Quarters:-
| Sanitary Workers presently available | No of sanitary workers provided with quarters | Year of Construction | Location & survey no of Quarters | Action taken to provide quarters for remaining workers |
| — | — | — | Nil | — |
| Observation | : | We need specific progress to Legacy waste and 100% Plastic disposal |
| Action points | : | Bio-Mining method is adopted and going on for legacy waste disposal and Pyrolysis unit were installed and running by the Municipality for 100% re-cycling of Plastic |
| Suggestions | : | 1) In future,to avoid hesitation from the plastic near by the Compost. yard. Propose Micro Compost Centre and work is in progress.
2) Out of 6 Nos of Micro Compost Centres, 4 MCC works completed ,4 put into use and another 2 MCC works under progress. 3) Onsite Compost method has proposed for Bulk Waste Generators and it will be enclosed Aug-2019. |