Water Supply

Source Ceuvery River Muttal Eri
Location Mettur Pick Dam Muttal Eri
Distance 103 K.M. 11 K.M.
Year of Commissioning 1994 1972
Installed capacity 8.85 MLD 0.90MLD
Designed up to ultimate with population
Head works infiltration well
3 Nos
Gallery Well 3 Nos
Collection Well 1 No 1 No
No. of Over Head Tanks with Capacity
1. Gandhi Nagar 7.50 Lakhs Litre
2. Gandhi Nagar 7.50 Lakhs Litre
3. Gandhi Nagar 7.00 Lakhs Litre
4. Kadaiveethi 7.50 Lakhs Litre
5. Mullaivadi 4.00 Lakhs Litre
6.Kumeresan street 2.00 Lakhs Litre
7. Old Bus Stand 2.50 Lakhs Litre
8. uppuodai 1.00 Lakhs Litre
9. Narasingapuram 1.00 Lakhs Litre
Total 40.00 Lakhs Litre
No. of Distribution Zone 72 Nos.
Length of Pumping Main 11 K.M.
Total Distribution Main 101.80 K.M.
Total No. of Public Fountain 72. Nos.
Motors Details Ulagalapadi Pick Dam Samuthiram Eri
Meintained by TWAD
20 HP,10 HP,7.5 HP
 
Generator (KVA) NIL
Pumping Details  
Head works 5.00 MLD
Local Sources 0.50 MLD
Total 5.50 MLD
LPCD Frequency 89 LPCD
Frequency 7 DayS
No. of Mini Power Pump 226 Nos.
No. of Hand Pump Bore Well 20Nos.
No. of Open Wells 18 Nos.
No. of Water Supply Lorry 2 Nos.
Total No. of House Service Connections
Domestic 11314Nos.
Non Domestic 167 Nos.
Industrial
Total 111481  Nos.
House Service Deposit Domestic Rs.6000/-
Non Domestic Rs.15000/-
Industrial Rs.25000/-
Tariff Domestic Rs.150/- Month
Non Domestic Rs.400/- Month
Industrial Rs.500/- Month